My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WETMORE
>
210
>
2800 - Aboveground Petroleum Storage Program
>
PR0544025
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 4:20:12 PM
Creation date
7/11/2019 4:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544025
PE
2832
FACILITY_ID
FA0005481
FACILITY_NAME
MANTECA CORP YARD
STREET_NUMBER
210
Direction
E
STREET_NAME
WETMORE
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21938313
CURRENT_STATUS
01
SITE_LOCATION
210 E WETMORE ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Control and Countermeasures Plan <br /> CITY OF MANTECA CORPORATION YARD <br /> 120 and 210 East Wetmore Street, Manteca, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION AND PURPOSE........................................................................ 1 <br /> 2.0. PLAN AMMENDMENTS - 40 CFR 112.3 and 112.5 ............................................ 1 <br /> 2.1. SCHEDULED PLAN REVIEWS............................................................................ 2 <br /> 3.0. PLAN ADMINISTRATION AND FACILITY INFORMATION.................................2 <br /> 3.1. MANAGEMENT AND DESIGNATED PERSONNEL - 40 CFR 112.7................... 2 <br /> 3.2. PROFESSIONAL ENGINEER CERTIFICATION - 40 CFR 112.3(d).................... 3 <br /> 3.3. PLAN AVAILABILITY - 40 CFR 112.3(e).............................................................. 3 <br /> 3.4. CROSS-REFERENCE WITH SPCC PROVISIONS (40 CFR 112.7).................... 3 <br /> 3.5. FACILITY DESCRIPTION - 40 CFR 112.7(a)(3) .................................................. 3 <br /> 3.5.1. Location and Activities.................................................................................4 <br /> 3.5.2. Facility Operating Structures and Areas ......................................................4 <br /> 3.5.3. Distance to Navigable Waters and Adjoining Shorelines and Flow Paths ... 5 <br /> 3.5.4. Discharge History ........................................................................................ 5 <br /> 3.5.5. Material Stored at this Facility — 112.7(a)(3)(i)............................................. 5 <br /> 4.0. DISCHARGE PREVENTION - GENERAL SPCC PROVISIONS..........................7 <br /> 4.1. COMPLIANCE WITH APPLICABLE REQUIREMENTS - 40 CFR 112.7(a)(2)..... 7 <br /> 4.2. SPILL REPORTING - 40 CFR 112.7(a)(4) ........................................................... 7 <br /> 4.3. POTENTIAL DISCHARGE VOLUMES AND DIRECTION OF FLOW - 40 CFR <br /> 112.7(b)................................................................................................................ 7 <br /> 4.4. CONTAINMENT AND DIVERSIONARY STRUCTURES - 40 CFR 112.7(c)........ 8 <br /> 4.4.1. Spill Pallets.................................................................................................. 8 <br /> 4.4.2. Fueling Area ................................................................................................ 8 <br /> 4.4.3. Oil Transfer Areas ....................................................................................... 8 <br /> 4.4.4. Loading/ Unloading Area ............................................................................. 8 <br /> 4.4.5. Drainage System ......................................................................................... 8 <br /> 4.4.6. Practicability of Secondary Containment— 40 CFR 112.7(d)........................ 9 <br /> 4.5. INSPECTIONS, TESTS, AND RECORDS - 40 CFR 112.7(e).............................. 9 <br /> 4.5.1. Daily Inspection ........................................................................................... 9 <br /> 4.5.2. Monthly Inspection....................................................................................... 9 <br /> 4.5.3. Annual Inspection ...................................................................................... 10 <br /> 4.5.4. Periodic Integrity Testing ........................................................................... 10 <br /> 4.6. DISCHARGE PREVENTION PROCEDURES AND TRAINING-40 CFR112.7(f) .... 10 <br /> 4.7. SECURITY - 40 CFR 112.7(g)............................................................................ 11 <br /> 4.8. TANK TRUCK LOADING/ UNLOADING RACK - 40 CFR 112.7(h).................... 11 <br /> 4.9. BRITTLE FRACTURE EVALUATION - 40 CFR 112.7(i).................................... 11 <br /> 4.10. CONFORMANCE WITH LOCAL REQUIREMENTS - 40 CFR 112.70) ........... 11 <br /> 4.11. QUALIFIED OIL-FILLED OPERATIONAL EQUIPMENT - 40 CFR 112.7(k).... 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.