Laserfiche WebLink
25 October 2019 AdvancedGeo <br /> AGE Project No. 99-0637 F n v i ro n m e n t a l <br /> Page 17 of 19 <br /> 6.2.2. Major Discharge Cleanup and Guidelines <br /> In the event of a major discharge, the following guidelines apply: <br /> • All workers will immediately evacuate the discharge site via the designated exit <br /> routes and move to the designated staging areas at a safe distance from the <br /> discharge. Exit routes are included on the Facility diagram (Figure 2) and posted <br /> in the maintenance building, in the office building, and at the diesel fuel AST area. <br /> • If the Coordinator is not present at the Facility, the senior on-site person notifies <br /> the Coordinator of the discharge and has authority to initiate notification and <br /> response. Certain notifications are dependent on the circumstances and type of <br /> discharge. <br /> • The Coordinator (or senior on-site person) must call for medical assistance if <br /> workers are injured. <br /> • The Coordinator (or senior on-site person) must notify the Fire Department or <br /> Police Department. <br /> • The Coordinator (or senior on-site person) must call the spill response and cleanup <br /> contractors listed in the Emergency Contacts list in Appendix H. <br /> • The Coordinator (or senior on-site person) must immediately contact the Cal OES <br /> (800-852-7550) and the National Response Center (800-424-8802). <br /> • The Coordinator (or senior on-site person) must record the call on the Discharge <br /> Notification form in Appendix D and attach a copy to this Plan. <br /> • The Coordinator (or senior on-site person) coordinates cleanup and obtains <br /> assistance from a cleanup contractor or other response organization as necessary. <br /> • If the Coordinator is not available at the time of the discharge, then the next highest <br /> person in seniority assumes responsibility for coordinating response activities. <br /> 6.3. WASTE DISPOSAL <br /> Wastes resulting from a minor discharge response will be containerized in impervious <br /> bags, drums or buckets. The Coordinator will characterize the waste for proper disposal <br /> and ensure that it is removed from the Facility by a licensed waste hauler within 90 days. <br /> Wastes resulting from a major discharge response will be removed and disposed of by a <br /> cleanup contractor. <br />