My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
2900 - Site Mitigation Program
>
PR0505525
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 10:04:27 PM
Creation date
7/11/2019 4:50:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> AGE NC=95-0142 <br /> Site Health.arW Safety Pian <br /> Pap 3 of <br /> Location ,doh Function Levels of Protection <br /> Exclusion Zone Drill br�rirtgs A B C D Dtl�er <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> -slilyport.Zane Str rt functions A B C D Other <br /> Specific protective equipmem for each level ofproteption used is follows- <br /> Level D hardboi <br /> stee6wed <br /> halffa if ne <br /> gloves <br /> ay glasses <br /> if air purifying respirators are authorized, organicyaaor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. <br /> No changes of the specified levels of protection shall-be made without the approval of the site safety <br /> officer and the project teams leader- <br /> 6.0. <br /> ead6.0. ON-SM WORK PLANS <br /> Work party(ies)consisting of two persons will perfarrrr the following tasks: <br /> Project Team Leader: Task: " <br /> Kevin McKibben Log borings,preserve samples <br /> Work Party#1: Task: <br /> Drilling Crew Drill borings <br /> Drilling Crew Obtain samples <br /> V d OOLO 9S6 60�7, ON MV HMU Nd L L --V 966 L- L-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.