My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
2900 - Site Mitigation Program
>
PR0505525
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 10:04:27 PM
Creation date
7/11/2019 4:50:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> GeoEnvironmental, Inc. -0=- <br /> 08 July 2004 <br /> AGE-NC Project No. 95-0142 <br /> Mr. Harlin Knoll <br /> San Joaquin County- Environmental Health Department <br /> 304 E. Weber Avenue, Third floor <br /> Stockton, California 95202 <br /> Subject: Soil Vapor Extraction Modification Work Plan <br /> Former STOCKTON PLATING Facility <br /> 632 South El Dorado Street, Stockton, California <br /> Dear Mr. Knoll: <br /> At the request of Mr. Richard Leland,Advanced GeoEnvironmental,hic. (AGE)has prepared a soil <br /> vapor extraction (SVE)-modification work plan for the site located at 632 South El Dorado Street, <br /> Stockton, California. AGE has proposed modifications associated with the design of a SVE system <br /> at the above-referenced site. In accordance with the SJCEHD-approved Corrective Action Plan <br /> (CAP), an electric catalytic oxidizer SVE unit(Solleco SCAT 250)has been in operation at the site <br /> since 10 December 2003. <br /> A general trend of decreasing influent hydrocarbon SVE concentrations was observed at the site <br /> between February 2004 and June 2004 (attached). Based on the manufacturer's guidelines and <br /> AGE's past remediation experience, a catalytic oxidizer SVE unit is usually most efficient when <br /> operational at hydrocarbon vapor concentrations between 2,000 µg/1 and 10,000 µg/1. <br /> Furthermore,between December 2003 and June 2004(6 months of operation),the cost of electricity <br /> (PG&E)to operate the catalytic oxidizer SVE unit at the site totaled above$10,000.00.The elevated <br /> PG&E cost can be attributed to the decreasing SVE vapor concentrations and a reduced efficiency <br /> of the catalytic oxidizer SVE system over this operational period.Therefore,based on the decreasing <br /> SVE hydrocarbon concentrations (less than 200 µg/1) and significant electrical utility costs, AGE <br /> proposes to replace the current catalytic oxidizer SVE unit with a more energy efficient,regenerative <br /> vacuum blower-based SVE system. Based on influent vacuum measurements that have generally <br /> been observed at the site between 30 and 40 inches of water,AGE anticipates the influent air flow <br /> stream to be approximately 125-150 standard cubic feet per minute(scfin)utilizing a 3'Fz-horsepower <br /> vacuum blower. <br /> 837 Shaw Road,Stockton,California 95215 - <br /> Telephone(209)467-1006 FAX(209)467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.