Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> ?' —mss •� Donna Heran, REHS <br /> 600 East Main Street <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> �q. .��P Website: www.sjgov.org/ehd Kasey Foley, REHS <br /> F o <br /> i R Linda Turkatte, REHS <br /> Phone: (209) 468-3420 <br /> October 13, 2010 Fax: (209) 464-0138 <br /> ElitelV Contractors <br /> 2535 Wigwam Dr. <br /> Stockton, CA 95205 <br /> Re: Cherokee Arco Addendum SR0059548 <br /> 900 E. Cherokee Ln. Lodi, CA 95240 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to replace the existing diesel dispenser with a new Gilbarco Legacy <br /> Series model #JHA-100 Dual Master Dispenser and a Bravo conversion frame CONY-132000 on <br /> the underground storage tank (UST) system at the above noted address. An addendum has <br /> been added to include the replaced and all ready tested shear valve at the diesel dispenser. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Aris Cacapit at (209) 468-3453 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Primary piping soap test: One hour pneumatic pressure test at 110% of operating <br /> pressure, or 40 psi, whichever is greater for the diesel line. <br /> b. Inspector to verify that the Bravo Conversion Frame CONY-132000 has been installed <br /> correctly with the Gilbarco Legacy Series model #JHA-100 Dual Master Dispenser. <br /> Please be aware that the facility cannot operate the UST system or receive fuel in <br /> the diesel tank prior to the EHD inspection and approval. <br /> 4. If concrete will be broken near the diesel piping, a secondary containment test must be <br /> performed on the diesel piping once concrete is poured in accordance with the <br /> manufacturer's guidelines. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br />