My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
INSTALL 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:01:10 PM
Creation date
7/12/2019 2:50:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . BEDDING AND BACKFILL: <br /> * ALL TRUSCO SUPERTANKSn SHALL BE INSTALLED USING AN APPROVED , <br /> INERT BEDDING AND BACKFILL MATERIAL AS SPECIFIED BELOW . <br /> SAND : CLEAN AND FREE OF DEBRIS <br /> GRAVEL : 3/ 4" OR SMALLER ROUNDED AGGREGATE OR PEA GRAVEL <br /> * THE EXCAVATION BASE SHALL BE COVERED WITH A MINIMUM OF 12" <br /> APPROVED BEDDING :MATERIALS . <br /> * WARNING: PLACEMENT OF A TANK DIRECTLY ON A HOLD DOWN PAD , ON A <br /> PAD SMALLER THAN THE TOTAL TANK AREA, OR ON INTERMEDIATE <br /> SUPPORTS ( SADDLES) WILL CAUSE UNEVEN DISTRIBUTION OF LOADS. <br /> THIS MAY CONTRIBUTE TO STRUCTURAL FAILURE, AND IS NEVER <br /> PERMITTED . <br /> * THE BACKFILL SHALL BE UNIFORMLY THE SAME AS THE BEDDING <br /> MATERIALS AND SHALL BE PLACEZ ALONG THE BOTTOM AND SIDES OF THE <br /> TANK IN SUCH A MANNER AS TO ENSURE THE TANK IS FULLY AND EVENLY <br /> SUPPORTED . <br /> * WARNING: DO NOT STRIKE THE F. R. ? . SECONDARY CONTAINMENT WITH <br /> SHOVELS , TAMPING TOOLS , OR EQUIPMENT! <br /> 4. CONTRACTOR REVIEW OF TANK DELIVERY DOCUMENTATION : <br /> * THE TRUSCO TANK DELIVERY DRIVER SHALL SUBMIT THE FOLLOWING <br /> DOCUMENTATION TO THE CONTRACTOR UPON ARRIVAL AT THE TANK <br /> INSTALLATION JOB SITE: <br /> INSTALLATION INSTRUCTIONS <br /> INSTALLATION CHECKLIST (ONE PER TANK) <br /> CALIBRATION GAGE CHART (ONE PER TANK SIZE) <br /> SPECIFICATION SHEET (ONE ?ER TANK) <br /> PRESSURE TEST INSTRUCTIONS (WHEN APPLICABLE) <br /> * THE CONTRACTOR SHALL COMPARE THE SPECIFICATION SHEET WITH THE <br /> ACTUAL TANK TO VERIFY : TANK CAPACITY, UL NUMBER, AND NOZZLE AND <br /> APPURTENANCES CONFIGURATION . <br /> * THE CONTRACTOR SHALL RECORD THE ACTUAL VACUUM LEVEL . SEE <br /> QUESTION $1 ON THE INSTALLATION CHECK LIST. <br /> * THE CONTRACTOR SHALL SUBMIT THE CALIBRATION GAGE CHART TO THE <br /> TANK OWNER . <br /> * THE CONTRACTOR SHALL COMPLETE THE INSTALLATION CHECKLIST AND <br /> MAIL BACK TO TRUSCO TANK. TRUSCO TANK WILL MAIL THE WARRANTY <br /> DIRECTLY TO THE TANK OWNER. <br /> 3 rev . 7/13/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.