My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
INSTALL 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2019 5:01:10 PM
Creation date
7/12/2019 2:50:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br /> DATE: December 1, 1993 <br /> TO: Paul C. Clark, Senior Engineer <br /> Ultramar Inc. <br /> 525 W. Third Street <br /> Hanford, Ca 93230 n <br /> FROM: PHS-EHD <br /> �On. <br /> P.O. Box 2009 <br /> Stockton, Ca 95201 <br /> RE: 900 S. Cherokee Lane, Lodi <br /> I have reviewed the installation application submitted for the <br /> above mentioned address. The following items must be addressed <br /> prior to permit approval. <br /> 1. Please submit a tank cross sectional diagram for the 8, 000 <br /> gallon unleaded supreme/ 12 , 000 gallon unleaded tank. <br /> 2 . Will there be ball float valves installed in the phase two <br /> vapor return line to the dispenser? <br /> 3 A precision test is required after the tank system has been <br /> completely installed and the station is operational. <br /> - 4 . The contractor information on page three of the installation <br /> application needs to be completed. <br /> 5. The application submitted specifies the capacity of the spill <br /> catchment basin (OPW-1) to be five gallons. The manufacturers <br /> specifications state the capacity to be three gallons. Please <br /> submit an updated manufacturers specification sheet that <br /> reflects the change. <br /> 6. Are the tanks subject to floatation? Provide calculations. <br /> 7 . Will the continuous monitoring system shut down the pump when <br /> a leak is detected? <br /> 8 . What leak rate will the Gilbarco EMC system be programmed to <br /> monitor the pressurized lines? <br />
The URL can be used to link to this page
Your browser does not support the video tag.