Laserfiche WebLink
PUBLIC HEALTH SE VICES <br /> OPpUIN C <br /> SAN JOAQUIN COUNTY <br /> JOGI KHANNA M.D.,MT R A < <br /> Health Officer <br /> P.O. Box 2009 • (1601 East Hazelton Avenue) • Stockton, California 95201 <br /> (209) 468-3406 <br /> �q`v <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Public Health Services-Environmental Health Division (PHS-EHD) has established the <br /> following guidelines to assist you in the completion of your construction project. The guidelines specify the <br /> construction and monitoring criteria necessary to complete our review of your proposed underground storage <br /> tank (UST) system. <br /> 1. SUBMITTAL OF PLANS <br /> a.,/ Submit 3 complete sets of detailed drawings in non-erasable print to the Environmental <br /> Health Division. Upon approval, one set will be retained by the department and the other <br /> two will be returned. <br /> b. Include equipment and material specification sheets and manufacturer's brochures describing <br /> operating and monitoring systems and listing numbers or other evidence of a nationally <br /> recognized testing organization approval. <br /> c. ✓ Include detailed monitoring and response plans for facility. <br /> d../ The drawn to scale plot plan should illustrate the location of all existing and proposed <br /> structures, including existing UST(s). <br /> e.,/ The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from subgrade to finish grade. <br /> 2. PLAN REVIEW AND OPERATING PERMIT FEES <br /> a.„ New facility plan review fee of$624.00 (8 hour minimum per facility), $170.00 fee per tank, <br /> plus $56.00 state surcharge fee per tank is due at time of plan submittal. <br /> b. New installation of additional tank at an existing facility is $624.00 plan review fee (8 hour <br /> minimum per facility) plus$170.00 fee per new tank,and$56.00 per tank state surcharge fee. <br /> C. It should be noted that a $624.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of$78.00 per hour. <br /> d.ii The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS/EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. ; iy.-�: ;N-.^r, F. <br /> e. If gross deficiencies are identified, the pians will be returned with checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date. t- -TTC►_ A--A,,,i-;: <br /> A Division of San Joaquin coulty Health(:are tiemces C <br />