Laserfiche WebLink
I , <br /> 4 _ <br /> + <br /> ry , <br /> 04 November 1996 <br /> AGE-NC Project,No 95-0142 - <br /> Page 4 of 4 F <br /> I <br /> elevation has remained well above the screened intervals in the existing momtonng wells for <br /> I; an extended length of time ° <br /> • The next quarterly ground water monitoring should be scheduled for December 1996 if, = - <br /> ground water elevations are below the top of the screened intervals, wells MW-1 through , <br /> MW-4 should be sampled However, if ground water continues to remain above the screened- <br /> intervals,then samples should also be collected,from each vapor wells containing sufficient <br /> I <br /> water, <br /> for sampling <br /> I <br /> • The concentrations of petroleum hydrocarbons detected in the purge water sample do not # <br /> I ehceed acceptable limits for discharge into the City of Stockton treatment plant Therefore, } <br /> we reconunend obtaining pennissjon from the City of Stockton to dispose of the purged <br /> water into the sanitary sewer ,I ` <br /> F , <br /> + { J I• t <br /> 50. LIMITATIONS <br /> Our professional services were perfomied using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of data <br />' points(i e monitoring wells, ground water samples) and subsurface conditions may nary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> y <br /> I } r <br /> I I <br /> I <br /> ,I <br /> 1 <br /> I ✓' <br /> s 1 <br /> 5 <br />•1 ' L V ' Y <br /> i <br /> 5 <br /> ' I <br />