Laserfiche WebLink
02 February 1996 <br /> AGE-NC Project No 95-0142 <br />' Page 4 of 4 <br />' 5 2 REMEDIATION OF HYDROCARBON-IMPACTED SOIL AND GROUND WATER <br /> The CAP for remediation of hydrocarbon-impacted soil and ground water was completed and <br />' submitted to the PHS-EHD in December 1995 Upon approval of the CAP, installation of the <br /> proposed SVE/IAS system should proceed <br /> 1 T <br /> 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon r <br /> analytical results provided by an independent laboratory Evaluations of the geologsc/hydrogeologic <br />' conditions at the site for the purpose of this investigation are made from a limited number of data <br /> points(i a monitoring wells, ground water samples) and subsurface conditions may vary away from <br />' these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> S <br /> J J <br /> f <br /> 1 ^ <br /> e r <br />