Laserfiche WebLink
, <br /> TABLE OF CONTENTS - <br />' 110 INTRODUCTION AND SCOPE OF WORK 1 <br /> 20 BACKGROUND 1 <br />' <br /> 21 SITE DESCRIPTION 1 <br /> 2 2 UNDERGROUND STORAGE TANK REMOVAL I <br />' <br /> 23 INITIAL SITE ASSESSMENT 2 <br /> 24 INSTALLATION OF GROUND WATER MONITORING WELLS 2 <br />' <br /> 30 SOIL VAPOR EXTRACTION WELL INSTALLATION 3 <br /> 3 1 DRILLING AND SAMPLING 3 <br /> 32 LOGGING 3 <br />' 3 3 WELL COMPLETION 3 <br /> 34 ANALYTICAL RESULTS OF SOIL SAMPLES 4 <br /> 40 QUARTERLY GROUND WATER MONITORING, SEPTEMBER 1995 4 <br /> 4 1 GROUND WATER MONITORING PROCEDURES 4 <br /> 42 COLLECTION OF GROUND WATER SAMPLES 4 <br />' 43 GROUND WATER FLOW DIRECTION AND GRADIENT 5 <br /> 44 ANALYTICAL RESULTS OF GROUND WATER SAMPLES 5 <br /> 50 SOIL VAPOR EXTRACTION PILOT TEST 5 <br /> 5 1 SOIL VAPOR EXTRACTION SYSTEM 5 <br /> 52 PILOT TEST PROCEDURES 5 <br /> 53 COLLECTION AND ANALYSIS OF VAPOR SAMPLES 6 <br /> 54 RESULTS OF SOIL VAPOR EXTRACTION PILOT TEST 6 <br /> 55 ANALYTICAL RESULTS OF VAPOR SAMPLES 7 <br /> 1 <br /> 60 SOIL REMEDIATION ALTERNATIVES 7 <br /> 61 SOIL VAPOR EXTRACTION 7 <br /> 611 PRINCIPLES 7 <br /> 6 1 2 REQUIRED SOIL CONDITIONS 8 <br /> 6 1 3 MONITORING ACTIVITIES 8 <br /> 6 1 4 FEASIBILITY OF SOIL VAPOR EXTRACTION 9 F <br /> 615 DURATION 9 <br /> 6 1 6 ESTIMATED COST OF SOIL VAPOR EXTRACTION 9 <br /> 62 EX-SITU TREATMENT OF IMPACTED SOIL 9 <br /> 6 2 1 EXCAVATION 10 <br /> ' 6 2 2 FEASIBILITY OF EXCAVATION 10 <br /> 623 ESTIMATED COSTS 10 <br /> 63 IN-SITU BIOREMEDIATION 10 <br /> ' 6 3 1 PRINCIPLES 10 <br /> 6 3 2 NUTRIENT REQUIREMENTS AND TOXICITY I1 <br /> 63 3 INOCULATION WELLS 12 <br /> 1 <br />