Laserfiche WebLink
r UARTERLY REPORT- <br /> July 1995 <br />' Stockton Plating <br /> 632 South El Dorado Street <br /> Stockton, California <br /> 1 <br /> r1.0. INTRODUCTION <br /> In accordance with the request of Stockton Plating,Advanced GeoEnvtronmental, Inc (AGE)has <br />' prepared this Quarterly Report for 632 South El Dorado Street in Stockton, California (the site) The <br /> location of the site is illustrated in Figure 1 A plan of the site is depicted in Figure 2 <br />' This report details soil and ground water assessment activities at the site between May and July 1995 <br /> Activities included the advancement of three push points for the purpose of soil sampling and nine, <br />' push points for collection of soil vapor samples <br />' 2.0. BACKGROUND <br /> 21 SITE DESCRIPTION <br /> The site is located along Scotts Avenue in a relatively flat area of southwest Stockton, immediately <br /> south of Morman Slough and east of the El Dorado Street overpass Local land use is the vicinity of <br />' the site is industrial and commercial Residential areas are located approximately one-quarter mile <br /> south and east of the site <br /> 2 2 UNDERGROUND STORAGE TANK REMOVAL h <br /> It is our understanding that two underground storage tanks(USTs) were removed from the property <br /> one 1,000-gallon leaded gasoline UST was removed from the site in August 1986 and one 2,000- <br /> gallon unleaded gasoline UST was removed from the site in 1990 Petroleum hydrocarbons were <br />' detected in soil samples collected from beneath both USTs at the time of removals Results of the <br /> UST removals were summarized in reports prepared by American Environmental Management <br /> Corporation(AEMC, 6 October 1986)and Condor Earth Technologies, Inc (CET, 2 January 1991) <br />' T <br /> 23 INITIAL SITE ASSESSMENT <br /> In September 1991, six soil borings were drilled at the site under the supervision of CET Petroleum <br /> hydrocarbons were detected in soil samples from five of the six soil borings Results of the <br /> investigation were summarized in a "Preliminary Investigation and Evaluation Report" dated 10 <br /> October 1991, prepared by CET <br /> t <br /> 1 <br />