My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007781
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 6:30:20 PM
Creation date
7/15/2019 3:46:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007781
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> I� <br /> Samples will be transported under chain-of-custody procedure <br /> ♦ Samples will be analyzed for TPH as gasoline and BTESX, in accordance with <br /> approved EPA methods <br /> ♦ Preparation of a Quarterly Report Each quarter, a quarterly report will be <br /> prepared The report will include all necessary maps, calculations and descriptions <br /> of site activities The report will be reviewed and signed by a Registered Geologist <br /> The cost for quarterly monitoring, based upon four (4) monitoring wells, should not exceed <br /> $1,900.00 per quarter <br /> 3.0 COST <br /> The costs for each TASK are included to Section 2 0 The costs quoted are based on the <br /> scope of work as discussed above and on our Standard Schedule of Charges, all costs will <br /> be billed to the Client on a time and materials basis <br /> The costs quoted are based upon normal soil/drilling conditions If adverse drilling <br /> conditions are encountered (i e , bedrock, flo%,�ing sands, caving, etc ) and additional drilling, <br /> CPT or soil vapor survey time is required to complete the scope of work, the final invoice <br /> will be adjusted accordingly Under no circumstances will additional work be performed <br /> without prior authorization to proceed from H&S The cost breakdown for Task 1 through <br /> Task 5 is as follows <br /> TASK 1 <br /> Wotk Plan, SHSP Piepaiahon, Background Review $ 30000 <br /> Project Geologist 4 lirs @ 75/lir $ 10000 <br /> Senior (Registered) Geologist 1 lir a) $100/hr $ 9000 <br /> Technician 2 his @ $45/hr $ 10000 <br /> Permit <br /> TASK 2 <br /> CPT Penetrations $ 2,80800 <br /> 27 samples @ $104/ea $ 43500 <br /> Grouting, 150 feet cY $2 90/foot $ 72000 <br /> Staff Geologist 12 hrs @ $60/hr $ 20000 <br /> Sampling Supplies <br /> TASK 3 <br /> Soil Vapor Survey $ 3,37500 <br /> 45 samples @ $75 00/sample $ 1,30500 <br /> Grouting 450 feet @ $2 90/foot <br /> Gmberal.�udq Semi«,i.e 4 <br /> SP 95 W SW ULST0Xvw' IL nNcry <br />
The URL can be used to link to this page
Your browser does not support the video tag.