Laserfiche WebLink
S <br /> I� <br /> Samples will be transported under chain-of-custody procedure <br /> ♦ Samples will be analyzed for TPH as gasoline and BTESX, in accordance with <br /> approved EPA methods <br /> ♦ Preparation of a Quarterly Report Each quarter, a quarterly report will be <br /> prepared The report will include all necessary maps, calculations and descriptions <br /> of site activities The report will be reviewed and signed by a Registered Geologist <br /> The cost for quarterly monitoring, based upon four (4) monitoring wells, should not exceed <br /> $1,900.00 per quarter <br /> 3.0 COST <br /> The costs for each TASK are included to Section 2 0 The costs quoted are based on the <br /> scope of work as discussed above and on our Standard Schedule of Charges, all costs will <br /> be billed to the Client on a time and materials basis <br /> The costs quoted are based upon normal soil/drilling conditions If adverse drilling <br /> conditions are encountered (i e , bedrock, flo%,�ing sands, caving, etc ) and additional drilling, <br /> CPT or soil vapor survey time is required to complete the scope of work, the final invoice <br /> will be adjusted accordingly Under no circumstances will additional work be performed <br /> without prior authorization to proceed from H&S The cost breakdown for Task 1 through <br /> Task 5 is as follows <br /> TASK 1 <br /> Wotk Plan, SHSP Piepaiahon, Background Review $ 30000 <br /> Project Geologist 4 lirs @ 75/lir $ 10000 <br /> Senior (Registered) Geologist 1 lir a) $100/hr $ 9000 <br /> Technician 2 his @ $45/hr $ 10000 <br /> Permit <br /> TASK 2 <br /> CPT Penetrations $ 2,80800 <br /> 27 samples @ $104/ea $ 43500 <br /> Grouting, 150 feet cY $2 90/foot $ 72000 <br /> Staff Geologist 12 hrs @ $60/hr $ 20000 <br /> Sampling Supplies <br /> TASK 3 <br /> Soil Vapor Survey $ 3,37500 <br /> 45 samples @ $75 00/sample $ 1,30500 <br /> Grouting 450 feet @ $2 90/foot <br /> Gmberal.�udq Semi«,i.e 4 <br /> SP 95 W SW ULST0Xvw' IL nNcry <br />