Laserfiche WebLink
T' <br /> i . <br /> 6.0 THIS PROPOSAL ASSUMES THE FOLLOWING <br /> ♦ All costs incurred due to regulatory directives, after this proposal, shall be assumed <br /> by the Client. <br /> ♦ Regulatory approval of work plan(s). <br /> ♦ The cost to remove, repair or relocate underground utilities or hazards that might <br /> interfere with the proposed drilling or excavation or are damaged during the drilling <br /> or excavation, shall be borne by the Client. <br /> ♦ Expense incurred because of unusual or unanticipated ground conditions (such as fill, <br /> hard soil, rock, etc) shall be paid for by the Client as extra work. <br /> 7.0 SCHEDULE <br /> The work outlined in this proposal can be initiated upon receipt of authorization to proceed <br /> from H&S GeoAudit will begin work on the project within five days of receipt of <br /> authorization to proceed and a deposit of $2,000 00 <br /> 8.0 LIMITATIONS <br /> Should there be any regulatory objections to the project or unanticipated regulatory <br /> requirements, only the fees for services performed to that time will be billed based on our <br /> Standard Schedule of Charges Should the regulatory agencies require additional monitoring <br /> or other services beyond the scope presented herein, or should drilling/sampling show that <br /> contamination is more extensive than previous reports present, the scope of work will need <br /> to be expanded at an additional cost submitted in wntten form prior to any actual work <br /> performed <br /> 9.0 BIDDING REQUIREMENTS <br /> Enclosed is GeoAudit's Statement of Qualifications (SOQ) Resumes of key GeoAudit <br /> personnel are included in the SOQ The following items are also included <br /> • A list of References has been included <br /> • A Standard Schedule of Charges is included <br /> • Upon acceptance of the proposal, GeoAudit will fumish the Client with <br /> OSHA.40-hour certificates for all personnel who will perform work at the site <br /> • Upon request, copies of all contractor and subcontractor licenses will be <br /> o..,,p-1 A.&S..—,I— <br /> Sp sr vsm$79-WATO -TON runNar, <br /> i 1 sr S <br />