My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:46:37 PM
Creation date
7/15/2019 3:46:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007782
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK PULL TESTING RESULTS <br /> Stockton Plating, Inc. <br /> 104 E. Scott Street <br /> IStockton, California <br /> San Joaquin County <br /> Prepared for: <br /> OIL EQUIPMENT SERVICE <br /> by <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> January 2, 1991 <br /> 1 <br /> 1 . 0 INTRODUCTION <br /> On December 11 , 1990, Oil Equipment Service, under the <br /> direct supervision of Keith Tallia, removed one 2 , 000-gallon <br /> underground storage tank from the Stockton Plating, Inc. <br /> Iproperty located at 104 E. Scott Street to Stockton, <br /> California (Figure 1 ) . Eric Trevena of the San Joaquin <br /> County Environmental Health Department was on site to <br /> I observe the tank removal and sampling procedures. The tank <br /> previously had contained leaded and unleaded gasoline and <br /> had not been used since October, 1990 . The final dimensions <br /> of the tank excavation were approximately 9 feet by 6 feet <br /> with a total depth of approximately 8 feet (Figure 2 ) . <br /> CONDOR <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.