My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007786
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007786
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 6:01:10 PM
Creation date
7/15/2019 4:15:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007786
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr! � <br /> 26 May 1998 <br /> AGE-NC Project No 95-0142 <br /> Page 4 of 4 <br /> documented release (vapor well VW-1), located immediately adjacent to the former TKi-90 <br /> UST Concentrations of TPH-g and BTE&X in the ground water samples collected from <br /> vapor wells VW-2 and VW-4 have remained similar to the concentrations detected in <br /> samples collected during the previous quarter, while hydrocarbon concentrations decreased <br /> in the sample collected from VW-3 <br /> • The dissolved hydrocarbon plume margins are not well delineated north, west and southwest <br /> of VW-4 or south of VW-1 The estimated extent of the dissolved hydrocarbon plume is <br /> depicted in Figure 4 <br /> 5 0. RECOMMENDATIONS <br /> Based upon past and present site conditions, AGE recommends <br /> • Continued quarterly monitoring, the next quarterly ground water monitoring should be <br /> scheduled for June 1998 <br /> • • Installation of an additional ground water monitoring well approximately 35 feet southeast <br /> of VW-1 near the inferred southern margin of the dissolved plume (see Figure 2) <br /> • Installation of additional soil vapor extraction and/or in-situ air sparg►ng wells needed for <br /> preparation for active remediation at the site <br /> • Dispose of purged ground water through a licenced waste hauler <br /> 6.0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologiclhydrogeologic <br /> conditions at the site for the purpose of this investigation were made from a Iimited number of data <br /> points (i a monitoring wells, ground water samples)and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> • <br /> Advanced GeoEntilrenmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.