My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007797
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007797
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 4:55:24 PM
Creation date
7/15/2019 4:22:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007797
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> Quarterly Ground Water Monitoring Report - Fourth Quarter 20'01 <br /> FORMER STOCKTON PLATING FACILITY , <br /> 632 South El Dorado Street, Stockton, California <br />' 1.0. INTRODUCTION <br />' At the request of Mr Richard Leland of R and L Business Management of Stockton, Advanced <br /> GeoEnvironmental, Inc (AGE)has prepared this report for 632 South El Dorado Street, Stockton, <br /> California(the site) This report documents the quarterly moni tonng results for November 2001 The <br /> site setting is illustrated on Figure 1 The locations of structures and monitoring wells on the site are <br /> depicted in Figure 2 <br />' Background information, including details of previous site assessment work, was presented in <br /> previous AGE reports including,Corrective Action Plan,dated 15 November 1995, Quarterly Report <br />' <br /> Results <br /> .1996, dated 05 April 1996 and in Quarterly Report -June 1998, dated September 1998 <br /> Results from previous ground water monitoring events are included in the tables of this report <br /> E <br />' 2.0. PROCEDURES <br />' Monitoring and sampling were performed in accordance with guidelines issued by the Central Valley <br /> Regional Water Quality Control Board (CVRWQCB) and conform to ground water monitoring <br />' guidelines issued by the San Joaquin County Public Health Services-Environmental Health Division <br /> (PHS-EHD) In addition, field work was conducted in accordance with the PHS-EHD-approved <br /> work plan Installation of Depth Discrete Wells, dated 10 December'l999 <br /> 1 <br /> 2 1 WELL MONITORING AND EVACUATION <br /> 4 <br />' On 05 November 2001, a Soimst water level meter was used to measure the depth to ground water <br /> in eight monitoring wells(MW-1 through MW-8)and four vapor wells(VW-1 through VW-4) The <br />' top of the screened intervals in wells MW-1 through MW-3 are approximately 15 feet below the <br /> ground water surface therefore the wells were not purged or sampled at the direction of the <br /> PHS-EHD <br />' After ground water depth measurements, a minimum of three casing-water volumes of water were <br /> removed from wells MW-4 through MW-8 and VW-1 through VW-4 using a submersible pump or <br />' dedicated polyethylene bailers Temperature,pH,and electrical conductivity were measured at regular <br /> intervals using an Oakton water analyzer Purge water stabilization field data sheets are included in <br /> Appendix A Purged water was stored on-site in labeled DOT-approved 55-gallon drums <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.