Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
' 10 September 2001 <br /> AGE-NC Project No 95-0142 <br />' Page 4 of 4 <br />' 5 0. RECOMMENDATIONS <br /> Based upon the data collected to date, AGE recommends <br />' a Implementation of the approved work plan for feasibility testing of ground water extraction <br />' 0 Implementation of Corrective Action following the final stage of feasibility testing <br /> • Continued quarterly monitoring of monitoring wells at the site The next quarterly ground <br /> water sampling and monitoring event should be scheduled for August 2001 <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologi c/hydrogeo logic <br /> • conditions at the site for the purpose of this investigation were made from a limited number of data <br /> points (i e momtoring-well ground water samples) and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> irecommendations contained in this report <br /> r <br /> 1 ' i <br /> 1 <br />