Laserfiche WebLink
I u <br /> 20 October 2000 <br /> . AGE-NC Project No 95-0142 <br />' Page 4 of 4 <br /> • Quarterly monitoring of all monitoring wells at the site The next quarterly ground water <br />' sampling and monitoring event should be scheduled for late January 2001 <br />' 60. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br />' conditions at the site for the purpose of this investigation were made from a limited number of data <br /> points (i e monitoring-well ground water samples) and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br />' recommendations contained in this report <br /> t <br /> 1 <br />