Laserfiche WebLink
t <br /> r <br /> rn <br /> r � <br /> • X24 October 2003 , <br /> AGE-NC Project No 95-0142 <br />' Page 4 of 4 <br /> • The distribution of MTBE suggests that the MTBE plume has laterally migrated to well <br />' MW-5 and vertically migrated to well MW-7 <br /> 5.0. RECOMMENDATIONS <br />' Based upon the data collected to date, AGE recommends <br /> • Continued quarterly monitoring at the site The next quarterly ground water sampling and <br />' monitoring event should be scheduled for December 2003 <br /> • Implementation of the AGE-prepared Final Remediation Plan, dated 23 April 2002 <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' . environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation were made from a limited number of data <br />' points (i a monitoring well ground water samples) and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions, recommendations contained in this report <br /> 1 <br /> r <br /> 1 <br /> r � <br />' Advanced GeoEnvironmental,Inc <br />