Laserfiche WebLink
� r <br /> 02 April 2002 <br /> AGE-NC Project No 95-0142 <br /> Page 4 of 4 <br />' 5.0. RECOMMENDATIONS <br /> Based upon the data collected to date, AGE recommends <br />' n Preparation of a remedial action work plan and implementation of the Corrective Action <br /> Plan <br /> • Continued quarterly momtonng of monitoring wells at the site The next quarterly ground <br /> water sampling and monitoring event should be scheduled for Apnl 2002 <br /> 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br />' analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation were made from a limited number of data <br /> . points(i e monitoring-well ground water samples) and subsurface conditions may vary away from <br />' these data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions, recommendations contained in this report <br /> 1 <br /> 1 - <br /> 1 <br />