Laserfiche WebLink
18 August 2004 <br /> AGE-NC Project No 95-0142 <br />' Page 4 of 4 i <br /> 5.0. RECOMMENDATIONS f <br /> Based upon the data collected to date, AGE recommends <br />' Continued quarterly monitoring at the site The next quarterly ground water sampling and <br /> monitoring event should be scheduled for August 2004 , <br />' Continued remediation activities at the site, as proposed in the AGE-prepared Final <br /> Remediation Plan, dated 23 April 2002 <br /> 6.0. LIMITATIONS <br /> tOur professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br />' analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation were made from a limited number of data <br /> points (i a monitoring well ground water samples) and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions, recommendations contained In this report <br /> ' , J <br /> t r <br /> � s ' <br /> k <br />' Advanced GeoEnvironmental,Inc <br />