Laserfiche WebLink
> <br /> • TABLE 3 <br /> Ground Water Extraction Data <br /> FORMER STOCKTON PLATING FACILITY <br /> 632 South El Dorado, Stockton, California <br /> Date Time Total Gallons Flow <br /> Gallons <br /> 02-09-04 Ground Water Extraction Startup <br /> 02-09-04 8 00 am 0 5 <br /> 02-11-04 10 00 am 2716 5 <br /> 02-12-04 8 00 am 5062 6 <br /> 02-13-04 8 00 am 10,211 6 <br /> 02-16-04 8 00 am 26,216 5 <br /> 02-19-04 8 30 am 41,120 5 <br /> 02-24-04 11 00 am 58,476 5 <br /> 03-01-04 1 Wpm 58,490 5 <br /> 03-08-04 2 00 pm 74,190 5 <br /> 03-09-04 12 30 pm 80,140 6 <br /> 03-17-04 1 Wpm 100,000+* 6 <br /> • 03-23-04 1 30 pm 127,740 5 <br /> 03-26-04 8 30 am 140,760 6 <br /> 03-31-04 1 00 pm 162,460 5 <br /> 04-08-04 8 00 am 169,916 5 <br /> 04-16-04 1 00 pm 205,510* 6 <br /> 04-21-04 1 30 pm 231,216 5 <br /> 05-03-04 12 00 pm 240,376 6 <br /> 05-17.04 100 m 281517 t 6 <br /> notes <br /> *meter reset at 100,000 gallons <br /> Advanced GeoEnvironmental,Inc <br />