My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007814
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:54:12 PM
Creation date
7/15/2019 4:31:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007814
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
der <br /> Remediation System Installation Report <br /> Former STOCKTON PLATING Facility <br /> 632 South El Dorado Street, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 10. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 21 SOIL-VAPOR EXTRACTION SYSTEM INSTALLATION 1 <br /> 2 1 1 SVE System Design and Supplemental Energy 2 <br /> 2 1 2 SVE Start-Up 2 <br /> 2 1 3 Soil-Vapor Extraction 3 <br /> 22 GROUND WATER REMEDIATION SYSTEM 3 <br /> 2 2 1 Installation of Ground Water Extraction System 3 <br /> 2 2 2 Installation of Underground Ground Water Extraction Pipeline Conduit <br /> 4 <br /> 2 2 3 Installation of Ground Water Extraction Pumps 4 <br /> 224 Installation of Ground Water Treatment System 5 <br /> . 2 2 5 On-Site Discharge Line Connection 6 <br /> 23 GROUND WATER TREATMENT OPERATION 6 <br /> 2 3 1 Ground Water Treatment Start-Up Period 6 <br /> 2 3 2 Influent and Effluent Monthly Monitoring Procedures 7 <br /> 3.0. FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 31 SOIL-VAPOR EXTRACTION 8 <br /> 32 SVE MASS OF RECOVERED HYDROCARBONS 9 <br /> 33 GROUND WATER TREATMENT RESULTS 9 <br /> 3 3 1 Laboratory Analysis of Ground Water Samples 9 <br /> 3 3 2 Laboratory Analysis of Effluent Ground Water Samples 10 <br /> 34 GROUND WATER MASS-VOLUME REMOVAL CALCULATIONS 10 <br /> 40. SUMMARY AND CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 5.0. RECOMMENDATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> 60 LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.