Laserfiche WebLink
• GENERAL PRETREATMENT INDUSTRIAL USERS <br /> PERMIT CONDITIONS <br /> 1 Permittee shall not allow any materials or any liquid waste to be discharged into the City of <br /> Stockton sewage system which could be harmful to the system or create a hazard or nuisance, <br /> as defined in Section 7-089 1 through 7-089 18 of the City of Stockton Municipal Code If <br /> the Permitter,is found to be responsible for damage to the City of Stockton Storm or Sanitary <br /> system, or for the excessive deposits of objectionable materials in said systems, Permittee <br /> may be required to bear the cost to the City for cleaning, or shall restore the affected part of <br /> the system to proper working condition A violation of any provision of these Permit <br /> Conditions, local codes, or the Federal Pretreatment Regulation may result in fines up to <br /> $6,000 per day for each violation or civil/criminal action <br /> 2 Industrial User shall not allow any pollutants, including oxygen demanding pollutants (BOD, <br /> etc ) to be released at a flow rate and/or pollutant concentration which a User knows, or has <br /> reason to know,will cause interference to the POTW In no case shall a sudden, unexpected <br /> discharge have a flow rate or contain concentrations of qualities of pollutants that exceed for <br /> any time period longer than 15 minutes more than five times the average 24-hour <br /> . concentration, quantities, or flow during normal operation (7 089 11 City Code) <br /> 3 Permittee shall insure that all pretreatment facilities, including but not limited to flow <br /> measuring and sampling equipment, are maintained in proper working order at all times, and <br /> that flow measuring devices are calibrated for accuracy by an approved qualified technician <br /> not less than twice per year, or upon request of an authorized City of Stockton representative <br /> Seasonal industries will have devices calibrated prior to the start of each season <br /> 4 In the event a required flow measuring or sampling device is found to be inoperative or <br /> providing unreliable information, as determined by authorized City of Stockton personnel, <br /> maximum quantities for parameters being measured may be used unless a previously <br /> negotiated amount can be verified by production statistics and water usage until such time <br /> as the equipment is restored to proper working order to the satisfaction of the Department <br /> of Municipal Utilities <br /> 5 Bypassing of pretreatment facilities at any time is strictly prohibited without the express <br /> written consent of an authorized City of Stockton representative in advance <br /> 6 Any breakdown or interruption of pretreatment, or any accidental discharge to the City of <br /> Stockton storm or sanitary system must be reported immediately Nonreporting of spill or <br /> slug incidents will be cause for administrative permit review and/or revocation of Permit <br /> 7 Pernuttee is required to self-monitor wastewater generated on site for pollutants specified by <br /> the City of Stockton Sampling procedures and handling must be approved by the City of <br />