My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007814
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:54:12 PM
Creation date
7/15/2019 4:31:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007814
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• GENERAL PRETREATMENT INDUSTRIAL USERS <br /> PERMIT CONDITIONS <br /> 1 Permittee shall not allow any materials or any liquid waste to be discharged into the City of <br /> Stockton sewage system which could be harmful to the system or create a hazard or nuisance, <br /> as defined in Section 7-089 1 through 7-089 18 of the City of Stockton Municipal Code If <br /> the Permitter,is found to be responsible for damage to the City of Stockton Storm or Sanitary <br /> system, or for the excessive deposits of objectionable materials in said systems, Permittee <br /> may be required to bear the cost to the City for cleaning, or shall restore the affected part of <br /> the system to proper working condition A violation of any provision of these Permit <br /> Conditions, local codes, or the Federal Pretreatment Regulation may result in fines up to <br /> $6,000 per day for each violation or civil/criminal action <br /> 2 Industrial User shall not allow any pollutants, including oxygen demanding pollutants (BOD, <br /> etc ) to be released at a flow rate and/or pollutant concentration which a User knows, or has <br /> reason to know,will cause interference to the POTW In no case shall a sudden, unexpected <br /> discharge have a flow rate or contain concentrations of qualities of pollutants that exceed for <br /> any time period longer than 15 minutes more than five times the average 24-hour <br /> . concentration, quantities, or flow during normal operation (7 089 11 City Code) <br /> 3 Permittee shall insure that all pretreatment facilities, including but not limited to flow <br /> measuring and sampling equipment, are maintained in proper working order at all times, and <br /> that flow measuring devices are calibrated for accuracy by an approved qualified technician <br /> not less than twice per year, or upon request of an authorized City of Stockton representative <br /> Seasonal industries will have devices calibrated prior to the start of each season <br /> 4 In the event a required flow measuring or sampling device is found to be inoperative or <br /> providing unreliable information, as determined by authorized City of Stockton personnel, <br /> maximum quantities for parameters being measured may be used unless a previously <br /> negotiated amount can be verified by production statistics and water usage until such time <br /> as the equipment is restored to proper working order to the satisfaction of the Department <br /> of Municipal Utilities <br /> 5 Bypassing of pretreatment facilities at any time is strictly prohibited without the express <br /> written consent of an authorized City of Stockton representative in advance <br /> 6 Any breakdown or interruption of pretreatment, or any accidental discharge to the City of <br /> Stockton storm or sanitary system must be reported immediately Nonreporting of spill or <br /> slug incidents will be cause for administrative permit review and/or revocation of Permit <br /> 7 Pernuttee is required to self-monitor wastewater generated on site for pollutants specified by <br /> the City of Stockton Sampling procedures and handling must be approved by the City of <br />
The URL can be used to link to this page
Your browser does not support the video tag.