10 EXTRACTION WELL PUMP INSTALLATION AND PROCESS PIPING NETWORK <br /> Ground water will be initially be extracted from ground water monitoring wells VW-1 to VW-4 and <br /> EW-1 and EW-2 to allow for immediate implementation ofthe proposed interim remediation system <br /> without the necessity to install extraction wells Grundfos Rediflow2 down-well pumps equipped <br /> with '/4-hp, 230V, 3-wire motors or equivalent will be installed in each of the wells One-mch <br /> diameter Schedule 40 PVC pipe will be installed from each pump discharge to the surface with a <br /> safety chain to prevent dropping the pump to the well bottom Also two-inch pneumatic pumps will <br /> be applied the smaller wells The well system is rated to remove up to five-gallons of water per <br /> minute (gpm) To minimize sediment intake through the pump, the bottom of the pump/motor <br /> assembly will be suspended approximately 5 feet above the well bottom Electrical wiring will be <br /> connected from the top of the pumps through Class I electrical connectors/unction boxes and <br /> electrical conduit to the pump controller or equivalent The extraction well pumps will be controlled <br /> by PumpTec controllers and the ground water extraction pumps will each operate on an independent <br /> controller or equivalent The pump controls will be supplied by an amperage sensing/time control <br /> switch This switch will detect a decrease of amperage when water level drops below the impeller <br /> intakes of the Grundfos pumps <br /> A network of two-inch diameter,schedule 80 PVC piping will be installed in a trench approximately <br /> foot wide by 11/Z feet deep Schedule 80 PVC conduits for electrical pump power will also be <br /> installed within the trench The PVC piping will be routed from each ground water extraction well <br /> head to a water holding tank,the holding tank will be connected to the GAC ground water treatment <br /> • system AGE plans to install a 2-inch diameter, schedule 80 polyvinylchlonde (PVC) pipe <br /> underground along the east side of the site to the City of Stockton discharge line located in SCOTTS <br /> AVE AGE anticipates a continuous discharge of treated ground water from site to the City of <br /> Stockton sanitary sewer at a flow rate of approximately 10 gallons per minute A plan of the <br /> proposed piping system and enclosed unit location are depicted in Figure 2 <br /> • <br />