My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007814
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:54:12 PM
Creation date
7/15/2019 4:31:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007814
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 June 2004 <br /> AGE-NC Project No 95-0142 <br /> Page 2 of 12 <br /> Sampling ports were installed upstream o f the vacuum blower inlet to recover Influent soil-gas vapor <br /> stream samples, and downstream of the catalytic converter to recover effluent stream samples to <br /> monitor the efficiency of hydrocarbon destruction Field measurements were recorded at regular <br /> intervals throughout the start up procedures and are summarized in Table 1 <br /> 2 1 1 SVE System Design and Supplemental Energy <br /> On 17 November 2003, a Solleco-manufactured EnvioPure 250 catalytic oxidizer soil-vapor <br /> extraction unit(SVE) was delivered to the site by AGE An SVE network was installed connecting <br /> wells VW-1 through VW-4,ground water extraction wells EW-1 and EW-2 and the SVE unit using <br /> 2-inch diameter schedule 40 PVC piping and 2-inch gate valves to control flow from Individual <br /> wells The piping was placed in trenches, approximately 12-inches below surface grade The two- <br /> inch networked SVE Inlet was connected to the SVE unit The influent line was routed through a 55- <br /> gallon moisture knockout vessel to a 7 5-horsepower,250-maximum standard cubic feet per minute <br /> (scfin) blower An in-line Dwyer Serres 647 in-line differential pressure transmitter (DPT) was <br /> installed in the 2 5-inch Influent line leading into the SVE catalytic oxidation unit This meter is <br /> . monitored monthly to calculated the influent rate <br /> On 18 November 2003, the electrical power source and electrical delivery lines were installed, the <br /> electrical Iine was Inspected and approved by the City of Stockton Building Department on 08 <br /> December 2003 An electrical meter was also installed by Pacific Gas and Electric on 09 December <br /> 2003 <br /> 2 1 2 SVE Start-Up <br /> The EnviroPure 250 SVE system began operation on 09 December 2003 The initiation of the SVE <br /> operation was authorized by representatives of the San Joaquin Unified Air Pollution Control <br /> District(APCD)and inspected by the EHD The SVE unit operation is conducted in accordance with <br /> APCD permit N-5011-1-0 (Appendix B) <br /> Measurement of the SVE flow rate, vacuum (potential), concentrations of the extracted soil-vapor <br /> and collection of set of soil-vapor samples were observed by the EHD personnel The samples were <br /> collected to document baseline concentrations of hydrocarbon vapor in the soil-vapor extracted by <br /> the SVE network and to determine the SVE hydrocarbon destruction rate <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.