My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007814
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:54:12 PM
Creation date
7/15/2019 4:31:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007814
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 1 1 1 1 • <br /> Control Box and Surge Arrester Grounding E Fuses Blow or Circuit Breakers Trip <br /> The control box shall be permanently grounded in accordance with the National Electrical POSSIBLE CAUSES HOW TOCHECK HOW TO CORRECT <br /> Code and local codes or regulations The ground wire should be a bare copper conductor 1 High or low voltage Check voltage at pump panel If not If wire size is correct,contact power <br /> at least the same size as the drop cable wire size The ground wire should be run as short ' within t 10% check wire size and company If not correct and/or replace <br /> a distance as possible and be securely fastened to a true grounding point length of run to pump panel as necessary <br /> I 2 Control box wiring and Check that control box parts match the Correct as required <br /> True grounding points are considered to be a grounding rod driven Into the water strata, ( components parts list Check to see that wiring <br /> matches wiring diagram Check for <br /> steel well casing submerged Into the water lower than the pump setting level, and steel loose or broken wires orterminais <br /> discharge pipes without Insulating couplings If plastic discharge pipe and well casing are 3 Defective capacitor Turn off power and discharge capacitor If no meter movement replace the <br /> used, a properly sized bare copper wire should be connected to a stud on the motor and f Check using an ohmmeter(Rx1DOK) capacitor <br /> run to the control panel Do not ground to a gas supply line Connect the grounding wire to When the meter is connected the <br /> the round point first and then to the terminal in the control box or panel needle should jump forward and slowly <br /> 9 P p � Britt bank <br /> 4 Starting relay(Franklin Cheek resistance of relay cod with an Replace defective relay <br /> Wiring Checks single-phase motors only) Ohmmeter(RxlOOOK) Check contacts <br /> for wear <br /> Before making the final wiring connections of the drop cable to the control box terminal, it is <br /> a good practice to check the Insulation resistance to ensure that the cable is good <br /> Measurements for a new installation must be at least 1,000,000 ohm Do not start the pump <br /> if the measurement is less than this If it Is higher, finish wiring and verify that all electrical <br /> connections are made in accordance with the wiring diagram Check to ensure the control <br /> box and high voltage surge arrester have been grounded . • r <br /> L-F II <br /> Table A Table B <br /> t Minimum Water Flow Requirements for Guide for Engine-Driven Generators In <br /> Submersible Pump Motors Submersible Pump Applications <br /> After the pump has been set Into the well and the wiring connections have been MOTOR CASING OR SLEEVE MIN FLOW PAST MINIMUM GENERATOR <br /> FO TT RATING EEWR F <br /> DIAMETER IO IN INCHES 7HEMOTOR(GPM) GENERATORFORTHREEWIRE <br /> made, the following procedures should be performed 4 4 12 SUBMERSIBLE PUMP MOTORS <br /> 5 7 EXTERNALLY INTERNALLY <br /> REGULATED REGULATED <br /> A Attach a temporary horizontal length of pipe with Installed gate valve to the riser pipe 7 21 MOTORHP GENERATOR GENERATOR <br /> 033 HP 1 5 KW 1 2 KW <br /> B If required make provisions to capture discharged fluids for disposal S 30 0 50 2 D 1 5 <br /> NOTES 0 75 3 0 2 D <br /> C Adjust the gate valve one-third open A flow inducer or sleeve must be used tf the I 1 0 1 4 0 2 5 <br /> i water enters the well above the motor or if 1 1 5 1 5 0 3 0 <br /> D Start the pump and let it operate until the water runs clear of sand and silt there is insufficient water flow past the motor NOTES <br /> 2 The minimum recommended water velocity over 1 Table is based on typical 80°C rise continuous <br /> F As the water clears, slowly open the gate valve in small increments until the desired 4' motors is 0 25 feet per second duty generators with 35%maximum votlage dip <br /> flow rate of clear water Is reached The pump should not be operated beyond its during start up of single phase motors <br /> maximum flow rating and should not be stopped until the groundwater runs clear 2 Contact the manufacturer of the generator to <br /> assure the unit has adequate capacity to run <br /> F If the groundwater is clean and clear when the pump is first started, the valve should the submersible motor <br /> still be opened until the desired flow rate is reached 3 If the generator rating is in KVA instead of <br /> f kilowatts multiply the above ratings by 1 25 to <br /> G Disconnect the temporary piping arrangements and complete the final piping III obtain KVA <br /> connections i <br /> H Under no circumstances should the pump be operated for any prolonged <br /> period of time with the discharge valve closed This can result in motor damage <br /> due to overheating A properly sized relief valve should be installed at the well head to <br /> prevent the pump from running against a closed valve <br /> I Start the pump and test the system Check and record the voltage and current draw <br /> on each motor lead <br /> f <br /> Page 5 • Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.