Laserfiche WebLink
I i <br /> 1 <br /> W <br /> 15 April 2004 , <br /> AGE-NC Project No 95-0142 <br /> Page 4 of 4 <br /> I - _ <br /> 5.0. RECOMMENDATIONS <br /> I <br /> Based upon the data collected to date, AGE recommends <br /> I0 Continued quarterly monitoring at the site The next quarterly ground water sampling and <br /> monitoring event should be scheduled for May 2004 <br /> I0 Continued remediation at the site as proposed in the AGE-prepared Final Remediation Plan, <br /> dated 23 April 2002 <br /> 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br />' analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation were made from a limited number of data <br /> points (i e monitoring well ground water samples) and subsurface conditions may vary away from <br />' . these data points No other warranty, expressed or implied, is made as to, the professional <br /> interpretations, opinions, recommendations contained in this report <br /> 1 <br /> 1 <br /> 1 <br /> F� <br />' Advanced Geo Environmental,Inc <br /> 1 <br />