My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007820
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:32:02 PM
Creation date
7/15/2019 4:35:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007820
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ly <br /> p <br /> iwells VW-1 through VW-4, ground water extraction wells EW-1 and EW-2 and the SVE unit using <br /> `• 2-inch diameter schedule 40 PVC piping and 2-inch gate valves to control flow from ndivdual <br /> wells The piping was placed in trenches, approximately 12-inches below surface'grade The two- <br /> inch networked SVE inlet was connected to the SVE unit The influent line was routed through a 55- <br /> gallon moisture knockout vessel to a 7 5-horsepower,250-maximum standard cubic feet per minute <br /> (scfrn) blower An in-line Dwyer Senes,647 in-line differential pressure transmitter (DPT) was <br /> I installed in the 2 5-inch influent line leading into the SVE catalytic oxidation unit This meter is <br /> monitored monthly to calculated the influent rate On 18 November 2003,the electrical power source Y <br /> and electrical delivery lines were installed,the electrical line was inspected and approved by the City 'E <br /> of Stockton Building Department on 08 December 2003 An electrical meter was also installed by <br /> I I Pacific Gas and Electric on 09 December 2003 <br /> SVE Start-Up <br /> } <br />' s The EnviroPure 250 SVE system began operation on 09 December 2003 The initiation of,the SVE <br /> operation was authonzed by representatives of_the San,Joaquin Unified Air Pollution Control <br /> V <br /> District(APCD)and inspected by the EHD The SE unit operation is conducted in accordance with ` <br /> tAPCD permit N-5011-1-0 ' <br /> Measurement of the SVE flow rate, vacuum (potential), concentrations of the extracted soil-vapor <br /> and collection of a set of soil-vapor samples were observed by the EHD personnel The samples were <br /> collected to document baseline concentrations of hydrocarbon vapor in the soil-vapor extracted by <br /> the SVE network and to determine the SVE hydrocarbon destruction rate ' <br /> lie <br />' GROUND WATER EXTRACTION SYSTEM INSTALLATION <br /> Four 1 5-inch diameter, stainless steel QED Environmental model H23SET pneumatic powered, <br /> t down-well pumps were installed in vapor extraction wells VW-1, VW-2, VW-3 and VW-4 The ; <br /> pumps were internally equipped with a one-way check valve to prevent backflow The pumps were - <br /> installed in each well at a depth of approximately 45 feet bsg One-half inch diameter poly-vinyl ' <br /> chloride (PVC) tubing was routed from each pump to the top of each well casing and through a 2- +" <br /> inch diameter sanitary well seal In the remediation area, a manifold was created with independent 5 ' <br /> ' flow meters and a dedicated sampling port to allow sampling of each well independently without ; <br /> having to remove each respective well head assembly t <br /> On 02 February 2004; a 4-mch diameter,'stainless steel model 5S8 Grundfos Rediflow down-well a <br /> pump equipped with 230 volt'/2-horsepower 3-wire motors were installed in groundwater extraction " <br /> well EW-1 The Grundfos pump was installed in well EW-1 at a depth of approximately 65 feet <br /> below surface grade(bsg) Schedule 40, 1-inch diameter PVC tubing was routed from the pump to, <br /> ' the top of the well casing and through a 4-mch diameter sanitary well seal In the remediation area, <br /> an independent flow meter and a sampling port was installed to allow sampling of the well without' <br /> having to remove the well head assembly, <br /> ' 1 t <br /> t � � <br /> ;5113 I' 1 5 1 w <br />
The URL can be used to link to this page
Your browser does not support the video tag.