Laserfiche WebLink
WORK REQUEST FORM <br /> (Gabbard) <br /> Date of Request: 9116102 Requested Completion Date: 9118102 <br /> Proj Name: Gabbard Prol No: 256 <br /> Site Address:_640 N. El Dorado, Stockton, CA Task: none <br /> Project Manager: John Lane Field Personnel: Scoma <br /> Client Contact: Gary Gabbard Phone No: <br /> Regulatory Contact: Lori Duncan Phone No: 468-0337 <br /> Approval: V �--� ( �r gL&-�L Completion Date: o byo-- or ex c <br /> READ AND UNDERSTAND PRIOR TO LEAVING FOR SITE <br /> 1 Lori Duncan has been notified. However, you should notify Jim at Wild Horses <br /> (tenant)_ Bring all equipment to purge and sample monitoring wells (bailers, pump, meters, <br /> interface probe) Monitoring wells MW i-MW4 are 2" diameter, 32 feet deep Water level at <br /> about 22 feet Monitor, purge and sample wells in order. Order is MW4, MW2, MW1, <br /> MW3. MW3 is hot and had free product since June 2001. MWs 1, 2, 4 are mildly <br /> impacted with PCE. <br /> 2 Monitor groundwater in monitoring wells in order listed above Use interface probe and take <br /> bailer cut on well MM3 <br /> 3 Sample groundwater in wells 1, 2, 4 for EPA 8260 full scan plus oxygenates } EDB, 1,2- <br /> DCA Send samples to Argon for analysis Note on chain of custody that EDF is required <br /> 4 Contain water in properly label drums <br /> 5 Take drum count and consolidate all drums in convenient location <br /> 6 Bail product from well MM3 and store in double-contained drum <br />