Laserfiche WebLink
iy WORK REQUEST FORM <br /> (Gabbard) <br /> Date of Request: 9121101 Requested Completion Date: 9121101 <br /> Proj Name: Gabbard Proj No: 256 <br /> Site Address: 640 N. El Dorado, Stockton, CA Task: none <br /> Protect Manager: John Lane Field Personnel- Scoma <br /> Client Contact: Gary Gabbard Phone No: <br /> Regulatory Contact: Lori Duncan Phone No: 468-0337 <br /> Approval: tf 1 d� Completion Date: V � ��3 .6r Occ <br /> READ AND UNDERSTAND PRIOR TO LEAVING FOR SITE <br /> Sample groundwater, sample soil from MW3 drum (see additional request) <br /> 1 Lori Duncan has been notified. Bring all equipment to purge and sample monitoring wells <br /> (bailers, pump, meters, interface probe) Monitoring wells MW1-MW4 are 2" diameter, 32 <br /> feet deep Water level at about 22 feet Monitor, purge and sample wells in order. <br /> Order is MW4, MW2, MW1, MW3. MW3 is hot and had free product in June 2001. <br /> MWs1, 2, 4 are mildly impacted with PCE. <br /> 2 Monitor groundwater in monitoring wells in order listed above Use interface probe and take <br /> bailer cut on well MW3 <br /> 3 Sample groundwater in monitoring wells for TPHg, TPHd, BTEX, TRPH, 8260 oxygenates + <br /> EDB, 1,2-DCA, VOCs by 8260, and lead (filtered) Bring samples to Argon for analysis <br /> 4 Contain water in properly label drums <br /> 5 Take drum count and consolidate all drums in convenient location <br /> 6 Collect field composite of soil generated during installation of well MW3 and send to lab for <br /> analysis by EPA8260 (see separate work request) <br />