Laserfiche WebLink
[AZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of <br /> METHOD OF EMPLOYEE NOTIFI, .ION (8) <br /> (e.g. siren, public address system, verbal N/A <br /> orders, etc.) <br /> EVACUATION ASSEMBLY AREA(S) (9) FRONT PARKING LOT <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE USE <br /> (10) FRONT PARKING LOT <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors(e.g. residential, commercial, open space)are located within 1/8th mile of our facility. <br /> Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH COMMERCIAL EAST COMMERCIAL <br /> SOUTH COMMERCIAL WEST COMMERCIAL <br /> SPILL CONTROL PROCEDURES SECTION <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> SPILL CONTROL LEADER (12) NEIL DAVIS &TERRI TAYLOR <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> NEIL DAVIS &TERRI TAYLOR / OWNERS <br /> UTHORIZED SPILL CONTROL STRATEGIES (14) <br /> his business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br /> needed equipment are shown on the facility map.At a minimum our business must isolate the area of the spill and <br /> make notifications. <br /> SPILLS OF LIQUID MATERIALS <br /> F Plug and Patch Container ■ Build Retention Dike <br /> 171 Remove Sources of Ignition E Position Container so as to Stop Leak <br /> F Reduce Pressure in Container/System R. Isolate Area and Make Notifications <br /> F Neutralize Spilled Material R Secure System Valves and Closures <br /> F11 Shutdown System Involved 9f Apply Absorbent Material to Spill Area <br /> M N/A <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> ❑ Shut Off Valves/Systems F Cover Spill to Prevent Spread <br /> * Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System F Position Container so as to Stop Leak <br /> F Suppress Vapors with Water E Place Spilled Material into Drum or Bag <br /> P1 Isolate Area and Make Notifications E Isolate Area and Make Notifications <br /> ttp:Hsjoesdata.org/oes hmmp/gp_HMMP detail.lasso?-Database=transaction+Plan+File&-Table=cdml H... 9/21/200 <br />