Laserfiche WebLink
GROUND ZERO ANALYSIS <br /> LOG OF WELL 5B 1 �MW7 <br /> PROJECT GABBARD LOCATION 640 N ELDORADO ST STOCKTON PROJECT NO 256 <br /> DATE DRILLED 5/6/03 & 5/25/03 LOGGED BY SEAN GARVEY REVIEWED BY <br /> *KILLING COMPANY FISCH ENVIRONMENTAL DRILLER DAVE FISCH METHOD HOLLOW STEM AUGER <br /> ORE HOLE DIAMETER 8 IN DEPTH DRILLED 37 FT DEPTH TO WATER INITIAL FT STATIC FT <br />' CASING TYPE PVC DIAMETER ___2 IN SCHEDULE 40 INTERVAL O FT TO 17 FT <br /> SCREEN TYPE PVC DIAMETER _ 2 IN SLOT SIZE 0 010 IN INTERVAL 17 FT TO 37 FT <br /> FILTER PACK TYPE .„#3 SAND - INTERVAL 15 FT TO 37 FT <br /> SURFACE SEAL TYPE NEAT CEMENT GROUT OVERLAYING BENTONITE INTERVAL 0 FT TO „ 15 FT <br /> COMMENTS PILOT HOLE BY DIRECT PUSH _ _ PAGE 1 OF�Z <br /> WELL DEPTH PID SAMPLE ID U S C DESCRIPTION <br /> DETAIL FT PPM BLOWCOUNT LOG <br /> 0-8' LEAN CLAY (CL), <5% FN, A, SND, >95% FNS, M-H DRY STRGTH, <br /> _ N-SLW DLTNCY, M-H TGHNESS, M-H PLAST, DK ERN, NPO, DRY-MST <br /> r 2 02 <br /> 4 CL <br /> 6 02 <br /> 8 <br /> f 8-16' SILTY CLAY (CL/ML), <5% FN, A, SND, >95% FNS, M DRY STRGTH, <br /> N-SLW DLTNCY, M TGHNESS, M PLAST, TAN, NPO, DRY <br /> 10 03 <br /> s <br />' 12 CL/ML <br /> 14 03 <br /> 15 16-20' SILT (ML), <5% FN, A, SND, >95% FNS, N DRY STRGTH, R DLTNCY, <br /> L TGHNESS, N PLAST, TAN/BRN, NPO, DRY-MST <br />' 18 0 2 ML <br /> GASB 1 1- <br /> 20 ---- — <br />' 20-25' SILT (ML), 5-10% FN, A, SND, N DRY STR, R DLTNCY, L <br /> TGHNESS, N PLAST, 8RN, N0 ODOR, MST-WET <br /> 22 01 ML <br />' 24 = � <br /> Qtr_-ASB1 1 25GW <br />' 26 01 <br /> 25-33' WELL GRADED SAND (SW), >957 FN-CRS, A-SR, W GRDD SND, <br /> 28 2-3% FN GRVL FROM 25-28', <5% FNS, WHT/BRN, NPO, WET <br />' SW <br /> 30 0 4 <br />' 32 ---- <br /> 33-36' CLAYEY SAND (SC), 60-70% FN-M, A-SA, W GRDD SND, 30-403 FNS, <br /> 34 0 3 SC BRN, NPO, MST-WET <br />' <br /> 36 36-40' SILTY CLAY (CL/ML), <5% FN, A. SND, >95% FNS, M DRY STRGTH, <br />' SLW DLTNCY, M TGHNESS, M PLAST, BRN, NPO, DRY-MST <br /> 38 0 2 CL/ML <br />' 40 <br />