Laserfiche WebLink
r� <br /> WORK REQUEST FORM <br /> Date of Request. 09/03/03 Requested Completion Date: 09/04-05/03 <br /> Proj Name: Gabbard Proj No: 256 <br /> Site Address: 640 N. El_Dorado, Stockton, CA Task: none <br /> Protect Manager: John Lane Field Personnel: Scoma <br /> Client Contact: Gary Gabbard Phone No: <br /> Regulatory Contact: Lori Duncan Phone No: 468-0337 <br /> Approval: 01 (0-5/c/3 Completion Date. 49 b" Cj Ar East-. <br /> READ AND UNDERSTAND PRIOR TO LEAVING FOR SITE <br /> 1 Bring all equipment to purge and sample seven site wells (MW 1-MW7) I expect you will <br /> need bailers, pump, meters, interface probe, w/1 probe All wells are 2" diameter Wells <br /> MW1-MW4 are about 32 feet deep, wells MW5-MW7 are about 36-37 feet deep Water <br /> level at about 24-25 feet <br /> 2 Monitor depth to water in all site wells The order is MW5, MW4, MW2, MW1, MW6, <br /> MW7, MW3 MW3 is hot and has free product (and skimmer) Use interface probe on well <br /> MW3 <br /> 3 Purge and sample wells in order Order is MW5, MW4, MW2, MW1, MW6, MW7, MW3 <br /> MW3 is hot and had free product since June 2001 MWs 1, 2, 4, 5 are mildly impacted with <br /> PCE MWs 6 and 7 are moderately impacted with PCE Sample all wells within 2 hours <br /> after finishing the purge <br /> 4 Collect a sample from well MW3 after removing floating product and purging 3 casing <br /> volumes (including product/water mixture) After removing floating product, be sure to <br /> purge remaining volume from the upper screened interval Collect sample only after you <br /> confirm that there is no floating product in the well bore <br /> 5 Send samples to Argon EPA 8260 full scan plus oxygenates + EDB, 1,2-DCA. Note on <br /> chain of custody that EDF is required <br /> 6 Contain water in properly labeled drums <br /> 7 Take drum count and consolidate all drums in convenient location <br />