Laserfiche WebLink
5 S , • • <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> as ex M on ure <br /> 1,2 Heavy Equipment (Noise & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in accordance <br /> with recognized industry standards and Cal- <br /> OSHA Title 8, Subchapter 4, Construction Safety <br /> Orders In addition, an exclusion zone applies to <br /> all personnel The exclusion zone will be 20 feet <br /> to the front and either side of the operating drill <br /> rig Personnel will not be allowed under booms or <br /> augers at any time <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection <br /> 1,2 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity In addition, water will <br /> be applied to control the dust if visible levels of <br /> . dust are generated <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site Keep sources of ignition away from these <br /> materials <br /> ble { as Pain# e10p F1 oilCombustible {Mash P int 09 - <br /> Gasoline <br /> O -Gasoline Diesel <br /> Motor Oil <br /> Type and Location of Fire Extinguishers !Show on map for large projects) <br /> Dry chemical fire extinnuishers, Class A, B, and C. are stored in all GZA vehicles <br /> PAGE <br />