My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007847
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
640
>
2900 - Site Mitigation Program
>
PR0529779
>
ARCHIVED REPORTS XR0007847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 9:59:28 AM
Creation date
7/17/2019 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007847
RECORD_ID
PR0529779
PE
2960
FACILITY_ID
FA0019644
FACILITY_NAME
FORMER GENE GABBARD INC
STREET_NUMBER
640
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906004
CURRENT_STATUS
01
SITE_LOCATION
640 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all GZA work saes Level D includes <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for each task <br /> as s) Condition Persane arment s <br /> None Working Near Vehicle Orange Vests <br /> 1,2 >20 ppm for 5 minutes 1/2 Face Respirator <br /> 1,2 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GIA hazardous waste sites <br /> Site will be secured as follows Fencing will be used when possible <br /> Site is secured with chain link roenmeter fencing <br /> Work Zones will be marked as follows Barricades and caution tape will be used to mark off <br /> work zone <br /> MARK WORK ZONES ON SITE MAP L7 CHECK WHEN DONE <br /> PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.