Laserfiche WebLink
Ms Lon Duncan <br /> August 24, 1998 <br /> Page 2 <br /> • SCOPE OF WORK <br /> Ground Zero will supervise the drilling and sampling of four soil borings in the viciruty of the former <br /> UST The locations of proposed bonngs are shown on Figure 2 A drilling company licensed in the <br /> State of California will advance the borings using a track mounted Geoprobe 5400 direct push ng <br /> Soil samples will be collected for logging and identification at 5-foot depth intervals Samples will be <br /> collected using a 1-mch diameter core sampler lined with clear acetate sleeves The portion of the <br /> sample to be analyzed will be immediately capped and preserved in an iced cooler at a temperature of <br /> approximately 4° Centigrade No cuttings requiring disposal will be produced using the direct push <br /> drilling method Borings will be backfilled to the ground surface with neat cement grout o0iy�- <br /> .benteartepellets <br /> Up to four soil samples per bonng will be submitted for analysis of total petroleum hydrocarbons as <br /> diesel (TPHD) and gasoline (TPHG) using EPA method 8015 modified, oil and grease using method <br /> 418 1 or 5520, benzene, toluene, ethylbenzene, xylenes (BTEX) using EPA method 8020, volatile <br /> organic compounds (VOCs) including gasoline oxygenate additives using EPA method 8260, and <br /> total lead using ICP 6010 Selection of soil samples for laboratory analysis will be based on field <br /> evidence of petroleum hydrocarbon contamination such as discoloration, odors, and FID readings, as <br /> well as lithologic changes <br /> One groundwater sample will also be collected and analyzed for the constituents listed above The <br /> . sample will be collected by dnving the sampler to the desired depth and exposing the screen to the <br /> formation The groundwater sample will be collected using a length of 0 17 inner diameter Teflon <br /> tubing equipped with a stainless steel bottom check valve The tubing will be inserted into the probe <br /> rods and pushed to the bottom of the sampler to the desired depth The groundwater sample will be <br /> brought to the surface by gripping the top of the tubing and rapidly moving the tubing up and down <br /> creating a positive displacement effect, thereby forcing the water sample to the surface where it will <br /> be collected directly into the sample containers <br /> All sampling and drilling equipment will be washed thoroughly with laboratory-grade detergent and <br /> water between uses to minimize the potential of cross contamination All field work will be <br /> conducted in accordance with the Site Safety Plan included in Attachment A <br /> A technical report describing field activities, analytical results, conclusions and recommendations will be <br /> submitted to Gene Gabbard, Inc, Ms Lon Duncan of PHS/EHD and Mr Mark List of the California <br /> Regional Water Quality Control Board(CRWQCB) <br /> A completed dnllrng pernut application and associated fees will be submitted under separate cover <br /> upon your approval of this workplan <br /> 9abbar&vq)0898 dorm <br />