Laserfiche WebLink
C k1 9 <br /> F + 4 <br /> 5 F 1 <br /> TABLE OF CONTENTS <br /> s , ' <br />' SECTION PAGE <br /> 10 INTRODUCTION I <br /> 20 PROCEDURES I , <br />' <br /> 21 SOIL BORINGS AND MONITORING WELL INSTALLATION -PHASE I 1 <br /> 2 1 1 Soil Sample Collection I <br /> 212 Logging 2 <br />' 2 13 Monitoring Well Installation 2 <br /> 2 1 4 Equipment Decontamination 3 <br />' <br /> 22 ADVANCEMENT OF SOIL PROBE BORINGS -PHASE II 3 <br /> 22 1 Soil and Grab Ground Water Sample Collection 3 <br /> 222 Equipment Decontamination 4 <br /> I30 FINDINGS 4 <br /> 31 SOIL PROFILE ,5 <br /> 32 FIELD EVIDENCE OF HYDROCARBONJMPACTED SOIL 5 <br /> 33 GROUND WATER DEPTH AND GRADIENT 5 <br /> • <br /> 34 RESULTS OF SOIL SAMPLE ANALYSIS 5 <br /> 3 5 RESULTS OF GROUND WATER SAMPLE ANALYSIS 5 <br /> 40 SUMMARY AND CONCLUSIONS 6 <br /> 50 RECOMMENDATIONS 6 <br />' 60 LIMITATIONS 6 <br /> FIGURES <br /> Figure 1 -Location Map _ <br /> Figure 2 -Site Plan <br /> Figure 3 -Monitoring Well Design <br /> Figure 4 - Geologic Cross-Section A-A' <br />' Figure 5 -Absorbed Hydrocarbon-Impacted Soil Cross-Section A-A' S <br /> Figure 6 -Absorbed Benzene-Impacted Soil Cross-Section A-A" <br /> Figure 7 - Geologic Cross-Section B-B' <br />' Figure 8 -Absorbed Hydrocarbon-Impacted Soil'Cross-Section B-B' <br /> Figure 9 - Geologic Cross-Section B-C <br /> Figure 10 -Absorbed Hydrocarbon-Impacted Soil Cross-Section B-C <br /> Advanced GeoEnvxronmental,Inc ' <br />