My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008081
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1347
>
3500 - Local Oversight Program
>
PR0544667
>
ARCHIVED REPORTS XR0008081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 1:03:01 PM
Creation date
7/17/2019 11:24:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008081
RECORD_ID
PR0544667
PE
3528
FACILITY_ID
FA0004962
FACILITY_NAME
CHEVRON 90342 (INACT)
STREET_NUMBER
1347
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14716030
CURRENT_STATUS
02
SITE_LOCATION
1347 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ID GROUNDWATER <br /> EIDETECHNOLOGY, INC. 1401 Halyard Drive,Suite 140 West Sacramento,CA 95691,(916)372-4700 <br /> FAX(916)372-8781 <br /> December 22, 1992 Project No 02030 0163 <br /> Mr Brett Hunter <br /> Chevron U S A Products Company <br /> 2410 Camino Ramon <br /> San Ramon, CA 94583-0804 <br /> RE QUARTERLY MONITORING AND SAMPLING ACTIVITIES <br /> CHEVRON SERVICE STATION NO 9-0342 <br /> 1347 SOUTH EL DORADO <br /> STOCKTON, CALIFORNIA <br /> Dear Mr Hunter <br /> Groundwater Technology, Inc submits this letter as a summary of quarterly groundwater monitoring <br /> and sampling data collected at the above-referenced site on October 26, 1992 The four site-related <br /> groundwater monitoring wells were gauged to determine depth to groundwater (DTW) and to check <br />• for the presence of separate-phase petroleum hydrocarbons A potentiometric surface map (Figure <br /> 1) and a summary of groundwater monitoring data (Table 1) are included After measuring DTW, <br /> selected monitoring wells MW-3 and MW-4 were purged and sampled Monitoring wells MW-1 and <br /> MW-2 are sampled on a semi-annual basis The groundwater samples were analyzed for dissolved <br /> benzene, toluene, ethylbenzene and xylenes (BTEX), and total petroleum hydrocarbons-as-gasoline <br /> (TPH-G) Results of the chemical analyses are summarized in Table 1 Laboratory reports and <br /> chain-of-custody manifests are included in Attachment A All purge water generated during the <br /> sampling process was collected in a Department of Transportation (DOT)-approved purge water <br /> trailer and transported for recycling to the Chevron refinery in Richmond, California <br /> Groundwater Technology, Inc is pleased to assist Chevron on this project If you have any <br /> questions or comments please call our West Sacramento office <br /> Sincerely, <br /> Groundwater Technol y, In Groundwater Technology, Inc <br /> Wrrtte bmitt Reviewed/Approved by <br /> AMES W GRASTY, A �E>;ED GE SIMONIS, R G <br /> Environmental Geol st G15 kED) Environmental Geologist <br /> Project Manager ,�oQS <br />. DSB/JWG/EKS rb Z <br /> +� No 4422 y <br /> Attachments <br /> 01630TR4 LTR . <br /> Offices throughout the U S,Canada and Overseas <br />
The URL can be used to link to this page
Your browser does not support the video tag.