Laserfiche WebLink
Chevron <br /> Chevron <br /> Chevron U S.A. Products Company <br /> 11�AtTF1 6007 Bollinger Canyon Rd, Bldg L <br /> P 0 Box 5004 <br /> tit M, San San Ramon, CA 34583-0804 <br /> October 12, 1994 <br /> Site Assessment& Remed:abon Group <br /> Phone (570) 842-9500 <br /> Mr Harlin Knoll <br /> San Joaquin County Environrnental Health <br /> P O Box 2009 <br /> Stockton, CA 95201 <br /> Re Former_Chevron Station#9-0342_, 1347 S El Dorado Street, Stockton, CA <br /> Attached groundwater momtonng report(GTI, 916194) <br /> Dear Mr Knoll <br /> Please find attached a report dated September 6, 1994, which was prepared by Chevron's <br /> consultant, Groundwater Technology Inc (GTI), to describe groundwater monitoring performed at <br /> the subject site on August 5, 1994 <br /> During GTI's August site visit all three site-related wells were gauged and sampled The measured <br /> direction of groundwater flow was toward the north-northeast Groundwater samples collected <br /> from wells MW-2, MW 3, and MW-4 were analyzed for the presence of TPHGas and BTEX <br /> constituents Except for 120 ppb TPHG detected at well MW-3, there were no dissolved petroleum <br /> hydrocarbons detected at any of the site wells <br /> If you have any questions or comments, I can be reached at (510) 842-8695 <br /> Sincerely, <br /> Brett L Hunter <br /> Environmental Engineer <br /> Site Assessment and Remediation <br /> Attachment <br /> cc Elizabeth Thayer, Central Valley RWQCB, Sacramento, CA <br /> Ramon Guerrero, 1327 S Wilson Way, Stockton, CA 95205 <br /> Bette Owen, Chevron USA, Products Company, San Ramon, CA (w/o attachment) <br />