Laserfiche WebLink
................ .......... ...... <br /> EQUIPMENT LIST <br /> OTY DESCRIPTION FURNISH INSTALL <br /> BY BY <br /> 20,000 GALLON COMPARTMENTALIZED DOLIBILE-WALL <br /> SCOPE OF WORK U G <br /> UNDERGROUND TANK CLOSURE PLAN <br /> UNDERGROUND TANKS SPLIT (10K GALJ10K GAL,) <br /> 6' HIGH CHAIN LINK FENCE POST "KEFP OUT" 29 INSTALL MONITORING S�'STEM WIT'H LIQUID SENSORS IN EACH TANK ANNULAR TANKS BY MUSCO, <br /> 1, FENCE OFF' WORK AREA WITH <br /> SIGNS ON FENCE EVERY 30 FEET, AT THE END OF' EACH WORK DAY SECORE SPACE AND IN SUVPS� INIST'ALL VONITOR CONTROL PANEL IN EXISTING <br /> BUILDING AS DIRECTED BY OWNER 20,000 GALLON COMPARTMENTALIZED DOUKE-WALL <br /> FENCING PANELS TOGETHIER, 111) _AEQ_Rm_Ar!_o,_ - _ DI G,C, <br /> 30 INSTALL, NEW CONCRETE TAN�< MAT AND OTHER CONCREfE AS INDICATED ON SITE UNDERICIROOND TANKS SPLIT (12K GAL,/8K GAL,) <br /> 10'--8 112" DIA,) TANKS BY TRUSCQ� <br /> 1�l LOCATION OF' IANKS BEAC( <br /> 2, FI-LISH, CLIT, AND REMOVE PRODUCT LINES FROM EYISTING TANKS TO DISPENSER PLAN, CONCRETE TO BE INSTALLED Al"XORDING TO UL-TRAMAR CONcRETE )N STATION fl695 <br /> ISLANDS, SPECIFICATIONS, DRIVE SLAB TO BE 6' rHICK, DIESEL DRIVE SLAB TO BE 8" THICK 900 5, CHEROKEF LANF <br /> TANK 5LAB 15 TO BE 8" �FIICK, SEE SITE PLAN ANO DETAIL ',-3HEFT_. LODI, CALIFORNIA 1 1/2 H,P RED ,JACKET SUBMERGED PUMP #PI50SL G�c <br /> 4 <br /> BURIAL OF 10'--8" D)A, TAOK BY IROSCO <br /> 3 REMOVE ALL EXISTING FUEL. DISPENSEF`�'S, ISLANDS, BARRICADES, FUEL LINES, QQ,N�TAIN, P QUNV5__QE_,lWE�_ <br /> ASPHALT AND CONCRETE SURFACES AS REQUIRED, IN PREPARATION FOR INSTALLATION 1 2 OWNFR: ULIPAVAR INC, <br /> INGS, ANY SALVAGEABLE FQIJIF)MENT TO RIF REMOVED 525 WEST THIPD STREE-f SUB PUMP RELAY CONIROL'BOX #880-030 <br /> OF NEW AS SHOWN ON DRAW 4 U G�c. <br /> FROM SOF AS D:RECTFD BY 1,,'LTPAMAR RFPRESENTATiVF 3 1 Nsrkl NEW GILBARCO VPD DISPENSERS AND CC)NSC)LE AS INDICATE0 01`4 SITE CA 932,kO FOR 1 1/2 I4,P SUBMERGED PUMP. <br /> PLAN AND DFSCRIBED IN THE EOUIPMENT LIST 1,3 PROJECTED CL0';IJRF DATE, To F 4 RED JACKIET LEAK DF,' IECTOR, u G,rlI <br /> 3F DFIF-RVINIFT) <br /> 4, _$f -) , - <br /> K -Q 36" BOUND MANHOLE w112" SKIRT FOR SUBMERGED <br /> SHORING TO BE NlINIVUV 20' AND DRIVEN "TIGHT". 1 4 TANK DATA 4 ------- U G,C, <br /> PUMP, PGVECO <br /> B� GENERAL CONIPACIOR, 32, AFTER THE TANK SLAB IS POLIRLD IFIE' CONTRACTOR SHALL REAPPLY VACUUM TO <br /> THE TANK ANNULAR SPACE AND SHALL MAKE ARRANGEVIFNITS Fe,)R!, HIE IJt,TPAYAP <br /> NVIVULR, QALLQN5 MAJURIAL-, 4 4`x2"x2" EXI'RACTOR VALVE, DPW U 01,0 <br /> 5. PREPARF I`_OR REMOVAL AND REMOVE F-CIOR (4) EACH, 20,000 GALLON EN(,',INF,,FR TO WIP�FSS IT, <br /> GRO �ND 6951_1 20,QQO SlEEL IJ N L EA D ED GASOLINE OPW u G C� <br /> UND�.',-ROR01-IND C�ASOLINE SI'ORAGE TANKS IN ACCORDANCE WITH THE U lNp� R L 3 4"x2`w3" EXTRACTOR VALVE <br /> 7 � SHOWN ON SIiF FlAN, �[AN, FTr' <br /> TANK T.,'I,.0SUI?E PLAN ULTPAMAR INC, WILL FVPrY` TANKS (,',,F REUSABtF PRODUCT 33 N' TALA ANY OTHER ITEMS A' PF T R 0 F I,)v P 69,5--2 20,000 S T EE L UNLEAUED P�,U 5 A',",,C.) F 7 4" BRASS EXTRACTOR CAP, OP* tj G�c, <br /> GENERAL (,,,0 N r RACT 0 R r 0 PROVIDE FOR DRY ICE TO PURGE TANKS, b 0 T NO L 695-- 3 20,000 O)TEEt SUPER i I NJ I fl'A U F (,,,A (�D I I N1 <br /> 'I IFY, "FOR, `�,,HALL PROVIDE FOR 12" ROUND MANHOLE FOR VAPOR RETURN <br /> THAN 25 LAS PER 1,000 GALLONS CAPAC CONTRAC F�9 5 4 20,000 17�1 F r <br /> TRANSPORTATION, C�ISPOSAL (-)F' TANKS ANT) RINSEAlE wITF-I 11 & H SHJ� SERVIC''E, �5 4 PAP-I-i PAVING 4 0 P,W`--1-04A--12 U G G, <br /> ER�CKSON'S OR OTHER AS APPROVED O'� IHE I.AIRAKIAR PROJECT EN(,,',INF E P 1.5 HISTOR'f, UNKNOWN ....... <br /> PIRW)IR TO BID -- CUTTING TANKS ON SITE WILL NOT BE ALLOWED. AIJ, AREAS TO BE PATCHED III OF III-1 PAVFYFI,,IT PREAKFp <br /> SOT'APF, (�',IJT W 16" ROUND MANHOLE w/SCREWS AND GASKET, FOR <br /> OR CONCRETE SAW 6 1-1--­­­........... <br /> ANNULAR SPACE YONITOR, POMECO #1IQ.­ 16WT G C, <br /> 6, CONTRACTOR 51­iALL PROVIDE FOR CLEAN�NG AS NECESSARY, TRANSPORFAF:ON, --------- <br /> I') �) - tC -G b EXCAVATF ALL AREAS TC) A DEPTi-I OF 6" AND REF)tACIF WOH 2" AC OVER ( ENFRAL! TO BE DF"'TERVINED FILL, SPiLl- CONTALNME,NT MANHOLE, <br /> Ci"PO,`�">AL Or TANK'3, AND RINSEATE IN A(,,,CORDAN F WITH COUNTY RE W AT:IONS 4" CRi.)SH ROCK OR C0NICRETE RASIT u G�c, <br /> AND LILTRAMAR APPROVAL, Tj_F OPW-1 (5 GALLON) <br /> LEAK DETECTION MON11ORING, CONSOLE FOR TANK <br /> 7, �jL,TRAVAR, �VLL CONTRAC7 WIFH AND FURNISH C,'ONSU�L`,'ANTS TO PERFORM SOIL PA�CH FAVE FOR DISTANCE OF' 2' AROUND ALL NEW CONCRETE, PRODUCT REMOVAL� INC, <br /> ANO W/O'E.R TESTIN3 UPON TANK Fl,'EVOVAL IN ACCORDANCE WITH TANK CLOSURE 1 ANNULAR SPACE SECONDARY CONTAINMEN�j,._,. I U G,c� <br /> 'Ai ------ <br /> PLAN AN'D 0C I REGu,_,A'Tl0lNS, ALLOW T'NENTY-FOUR mOURS FOR RESULlS OF' 35 ULFRAVAR WILL HIRE 01HER'S TO DO f`ANK AND LINE PRECISION TES11NGI BOTFO MIS PEYOVAL- f L F: GILRARCO TM4 <br /> SOIL SAYPLES, <br /> 36, NOTE� ANY ENViRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF TANK HAULER T L F� GILBARCO INTERSTITIAL FLOAT SWITCH FOR 4'-12' <br /> 8, ONCE S 1`10YPLE-7, C&IJRACTOR IS RESP(0NSlL3LE FOR REMOVING NORK SHALL BE DONr ON A TIVE AND MATERIAL'_.'� BASIS, RENTAL RECEIPFS, 2 U G,C, <br /> DIAMETER STEEL TANK <br /> ALL EXiSTIiNG BACKFILL VA,i'ERIAL TO ACHIEVE A `SQUARE,� CUl' HOLE� SUIBCONTRA'CTOR INVOICES, YATERAL RECEIPTS, AND CA10' LABOR TIYE S41EETS GEOLOGIST TO FIE DETF"RYINFD <br /> SHALI,, E,,E REQIJ��RED TO SUIPPORT GENERAL CON�'RACTOP TIME AND YAr[RAL I'E',S)TING I-ABORATORY 4 GILBARCO TURBINE SUMP/SENSORS U G�C, <br /> NVOICFS, SUC,14 WORK SII/�LL BE PiLLED SEPARATELY, r-,­___­_­­________,__" 11__l__,____ll_, <br /> I �GILBARCO 2" DIA RISER CAP KIr FOR <br /> 9, Co�,m��v­"­�-c�i:�� S�,V�L.�_ (--,-)VrR EXCAVATED SOIL W�TH At V1, PLASTIC UNTIL So�L, <br /> R <br /> IS IREMI'Vlt."-D S(-lh, 70 t3E, STOCKPlED 0,`,� SITE F01 SAVPIJNG PRIOR TC) TANK DISPO�Ai FACILJT`Y� TLF� 2 u G,C, <br /> �l �1. T RAVAIR, INTERSTITlAl. SENSOR <br /> OFF-HAOL AS I)'RE(,'71:,,) 13Y UL 2 1) Y A I <br /> _QY 1 5%2`,y24" FLEXIBLE PIPE CONNECTORS FOR <br /> 10, ,;�...T RAY A Sr,,AUL. P;RGVIIDE FOR TRA%SP'DR7ATIO'� AND' D�SPC)SAL OF EXCAVATEED 19 u G,c, <br /> Sol A�71EIR COVIPI-ETION OF A\4Y NECESSARY' RF_9EDATIONI, NCLUDiNG AERATFION, 2,1 rAN K'", DISPENSERS (5'VYIVEL I END) <br /> G,EN_ER A,_L_N_0_TE_S�:_,_ 3" x 30" LONG CONTAINMENT TECHNOLOGIES <br /> I "I , CONTRACT,�',;R TA,<E EX7REV,E CAJTION C�:JRI'\,G EX,,'_',AVA'Ti0N \,C,T TO REMOVE ALL, PRODUCT F'Rom TANkS 15 u G,c� <br /> SECONDARY CONTAINMENT BOOTS <br /> �,)E`OPARD�/E NTEEG­�­` CF �-I`: ENVRONMENTAL EXTRA�'TiGN UNES AND <br /> WELLS THE CONTPACTOR iS RESPONSIBLE FOR RESTORING 7 REMOVE ALA, RESIDUAL LIQUID, SOLIDS, OR SLODGIES, <br /> I FHE SYSTEM" 1, CONTRACTOR EVPLOYEES TO) HAVE COMPLETED 40 HOURS OSHA 'TRAINING COURSE 18" LONG FLEXIBLE PIPE CONNECTORS FOR <br /> TO A PRECO,"45711,UCT�0N SIATE, PRX)R TO THE START'OF W(ORK, CEPTIFiCAlION OF TFIIS MuST BE PROVIDED TO I L) u G,C <br /> THE ULTRAMAR ENGiNEER PffRIOR TO FHE STAR"] OF WORK, PURGE ALL VAPORS FROM TANKS WITH A NAINIYUM OF TWENry -FIVIE, (25) Poi,)NDS T-A-NKS- (SWVE I 1, 1-1-E I IND) ------ <br /> OF" SOLID CARBON DIOXIDE (DRY' ICE) FOR EACH 1,000 GALLONS OF TANK x 18" LONG FLEXIBLE PIPE CONNECTORS FOR <br /> 2, EXCAVA,rE AS NECESSAR" FOR TH E INSTALLA�;C)N OF REPLACEVIENT TANKS. 2, CONTPACTOR, EMPLOYEES 10) HAVE COMPLETED SMITH FIBERG�.ASS RED THREAD IIA CAPACIFY AND PRESENT SALES St-IPS, TO INSPECTOR, PELLETIZED DWI` ;CE IS LII G.G, <br /> TANKS <br /> 3, CC NTRACTOR SHALL PLACE SOIL W�TH 4 V)L. PLAST�C uN7�I, SOIL I ; RF"YOVED, TRAINING (CERTIFICATES REOJJIRED), RECOMMENDED CAP ALL OPENINGS EXCEPT VENT PIPE AND ALLOW TWO HOUR <br /> 5041 TO BE ',;TOCKP�LED 'AND SEGREGATE-D ON SI[E FOR SAMPLING PRIOR TO YINIMUM AND SIX HOUR MAXIMUM OR OXYGEN DISPLACEMENT AFTER PUTTiNG 41' DROP TUBE, OPW #61 --SO--C410, OVERFILL <br /> OFF-HAUL BY O­IkiERS AS D;RECTED BY I)LlRAVAR, 3 CONTRACTOR _10 HAVE BFEN� TRAINED BY TRUSCO TANK IN, TANK !NSTALLAI�ON CARBON DIOXIDE INTO THE rANFS VENT PIPE OPENING l'O BE CHECKED WITH <br /> 4 PIRLVENTION VALVE FOR 10'-8' DIA, -TANK BY <br /> (ULTRAMAR WILL VERIFY WiPH rROSCO) CONTRACTOR SHALL COMPLETE THE A COYBUSTIBLE GAS DETECTOR TO DETERYINE IF TANI< IS VAPOR FREE OR )F 11___l­.____ll­ I'�-11-1�l-.,.-",-�-"--,-,--"-,--,--,--l-l��-------,��,-�---,-'I �t u G C� <br /> 14, UL-RAVAR SHALL PROVIDE FCR TRANSPORTATION AND DiSPOSAL OF EXCAVATED TANK 1NISIALLATION CHECKLJ!ST (SUPPLIED TO CONTRACTOP BY' TPUSCO ()URING ADOITIONAL DRY ICE AND/OR TIME MAY BE REQUIRIED TRUSCO <br /> SOIL AFTER COMPLETION OF' ANY NECESSARY REMEDIATION, INCLUDING AERATI0,N, TANK 0ELUERY) AND SHALL FURNISH -TO ULTRAYAR 4 4" 'TWO POINT FILL ADAPTOR, OPW #633T-8075 u G�C� <br /> PLUG OR CAP ALL TANK OPENINGS LEAVING AN 1/8" - 1/4" PRESSURE REDEF <br /> CONI'RACTOR TO DEVELOP k SPECIFIC SITE SAFETY PLAN FOR TANK REVIOVAI.- AND HOLE IN ONE CAP AT THE TOP OF THE rANK, 4 4" TIGHT FILL CAP, OP'N #634TT-,7085 u G C. <br /> 151 INSTA�A_ "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES PEP, 4 TAINK INSTALLAT'ION PRIOR DO FHE START OF 'NORK� CONTRACTOR WILL CONDUCT <br /> DRAWINGS VISUALLY NSPECT THE TANKS UPON REMOVAL,, ALL EXTERNAL TANK SURFACES 4"xY VAPOR RECOVERY TWO POINT ADAPTOR <br /> WEEKLY JOB SITE SAFETY MIEETINGS WITH IT'S FyPLO'YFES AND THE MEETING, 3 U G,c� <br /> YINtJTES WILL BE SHIPPED "TO ULFRAMAR, AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLE�-,) OR LEAKAGIE, OPW #1611 AV-1620 <br /> THE REI5ULTS OF SUCH INSPECTION SHALL BE DOCUMENTED IN VIRITING, WIFI,4 <br /> 16, INSTALL TWO (2) EACH 20,000 GALLON COMPARTMENTALIZED TANi�,S 4" VAPOR RETURN TOP SEAL CAP, <br /> PER DETAILS ON DRAWINGS AND PER MANUFAClURFIR'S li,,4STRUCTIONS, -TANK 5 CONTRACTOR SHALL HAVE TI+�E FOLLOWING LICFNSES� PHOTOGRAPHS WHERE APPROPRIATE, OPW #711-T-7065 U G,C� <br /> BEDDIN(3 AND BACKFILL 1'0 BE PEA (-,RAVEL. 'TANK DURY IS TO BE vlNImuy a, GENERAL ENGINEERING "A" <br /> 4 FE!`,"T TANK BEDDING, IS Fo BE A MINIMUM 12", SPACING BETWEEN TANKS IS TO b, HAZARDOUS MATERIAL SUBSTANCIE HANCILING, FILIER FABRIC, TYPAR OR EQUIV., FOR TANK <br /> E T I,)R !_s -WO BENEATH THE TANK, ONE FROM ALL <br /> BE A M�NIMUV OF 1W, TANKS TO E SLOPED 2" TO 3" W171-i �BIN� AT IHE I )OIL, SAMPLES SHALL, BE ANALYZED FROM <br /> HOLE AND IRENCHES, TYPAR OR EQUtV, <br /> HIGH END, 6, CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE, CONTRACTOR 5HAILL, HAVE DIRECTLY BENEATH THE FILL PIPE, THE OTHER FROM A SIMILAR POSTION AT <br /> �U f 'UCFA INSURANCE ON FIII,E WITH ULTRAVAR BY NAMING ULTRAVAR AS THE OPPOSITE END OF THE TANK, IF' OBVIOUSLY STAINED OR CONTAMINATEID <br /> PROOF OF' 'S 4 FIBERGLASS TURBINE SUMP w/COVER BY IRUSCO u G.c, <br /> ­ ADDI-HONAL INSURED," AREAS EXIST IN LOCATIONS OTHER THAN THE ABOVE LOCATIONS, THEN <br /> 17� INSTALL- EQUIPMENT AS LISTED IN EQUIPYENT LISF INCLUDING SALVAGEABLE ADDITIONAL SOIL SAYPLES SHALL FIE ANALYZED FROY THESE OBVIOUSL,Y F9EIRGLASS PRODUCT, VAPOR & VEN'"T',P I P I N G,, <br /> STAINED OR CCNTAMINATED AREAS BY ULTRAMAR, <br /> EOUIPMENT TO BE REINSTALLED, IF ANY 7. CONIRACTOR SHALL HAVE TF­`IE FOLLOWING3 INSURANCE, CONTRACTOR SHALL HAVE ALL SECONDARY CONTA�NMENT PIPING & MISC� G,c� G,C <br /> PRQOF OF SUCH INSURANCE ON FILE WITH OLTRAVAR BY NAMING ULTRAMAR AS <br /> SOLL SAMPLES ',".,HALL BE C01-LECIED FROM THE NATIVE SOIL AT OR JUST BEL��,),A/ FITTINGS PER SPEC'S, IN SCOPE OF WORK <br /> 18� INSTALL NEW FIBERGLASS PRODUCT, VENT, VAPOR, AND SECONDARY CONTAINMENT 1\usn iNSIJRF"D," THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. SAMPLES SHALL EIE <br /> LINES PER SITE PLAN, STANDARD TANK DRAWINGS, AND PER SCHEDULE BELOW� B(_ACK IRON PIPING, NIPPLES & FITTING..; WHERE <br /> 0 EMPLO�EES LIABILITY WITH A MINIMUM LIYIT OF LIABILTry OF TAKEN USING' A DRIVEN­­TU8E TYPE SAMPLER, CAPPED AND SEALED WITH INEFf ALL G,c G,�c <br /> $1,000,000 FOR EACH OCCURRENCE, MATERIALS, FORYAL, SK3NED CHAIN� OF-CLISTODY RECORDS SHALL BE SHOWN IN DETAILS FOR GASOLINC PIPINGS, <br /> 19, PRODUCT PIPING� 2" RED 'THREAD HA AND RFD TI-ARCAD 11 FITTINGS, DS 8000 MAINTAINED FOR EACH SAMPLE AND SUBMITTED WITH THE RESULTS Tl',,) rT-IE 4 ISLAND FORMS 4'x7' DOGBONE FOR MPD'S (TYP.) C, <br /> SERIES ADHESIVE. ALL JOINTS MUST BE CURED USING SMITH FIBERGLASS CHEV 0 COYPREhENSIVE GENERAL L�AB I LI FY, INCLUDING CONTRACTOR'S REGULATING AGENCY BY ULTRAMAR, <br /> CURE PAKS, I ISLAND FORM 4'xl2' "STRAIGHT" W/RAISED ENDS u G,0, <br /> PROTECTIVE LIABILITY, COMPLETFID OPERATIONS LIABILITY, ANO <br /> CONTPACTUAL LIABILITY, WITH A COMBINED SINGLE LIIII OF To EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOWING ALTERNATIVE I ISLAND FORM 4'x7' "STRAIGHT" w/RAISED ENDS U G,C� <br /> VENT" P!PING� SAVE AS ABOVE NOT L.ESS THAN $1,000,000 PER OCCURR[NCE FOR BODII-Y SAMPLING METhOD MAY BE USED� ........------- <br /> GILBARCO ADVANTAGE 6 HOSE MPD, 3 PROD� 1, <br /> �l 2" AND 3" PIPING AS NOTFD INJURY AND F"ROPERrY DAVAGE- <br /> VAPOR PIPIN(3 SAVE AS ABOVE WIN IMMEDIATELY UPON REMOVAL OF THE TANK, A PACKHOE BUCKE-T OF BACKLIT BRAND PANELS, CANOPY, FULL VAPOR <br /> 0 N PLA N S AUTOMOBILE LIABILITY COVERING USIF OF ALL OWN[D HIRED NATIVE SOIL SHALI RE TAKEN FROV THE NATIVE POJL/BACKFILL --------------- <br /> IN�ERFAGE. THIS SOIL SHALL HE RAP�DLY DROUGHT TO THE 4 FOR BALANCE SYSTEM INCL, OPW 11 VF NOZZLES, U (1,C, <br /> SECONDARY' VEHICLES WITH A COMBINED SINGLE LIMIT QF SINGLE UNIT OF' 51.)R FAC F, <br /> P P 0 D u I' LIABILITY OF NOT LE9S THAN 1,1,000,000 PER OcCILIPREHCE FOR PHERMOID T-15" VENTURI HOSES, <br /> PIPING 3" RED THREAD IIA AND RED rHREA[) II FITTINGS, DS BODILY IN,JURY AND FIROPERrY DAMAGE APPROXIQATELY THREE INCHES SHVLL BE RAPIDLY SCRAPED AWAY YLEELD <br /> 7000 OR 8000 SFRIFS PDHESIVF, 8, GENERAL CONTRACTOR TO FURNISH ALL LABOR, MATERIAL FROM THE 5URFACE OF' THIS SOIL, THAN A CILEAN BRA5)5 TUBE (AT I GILBARCO DUAL -- REUSE EXISTING G,C, (3,C, <br /> F_0UIPYENT, AND LEAST THREE INCHES LONG) SHALL BE DRIVEN INTO fHF SOIL WITH <br /> NOTE: PEPS01I INSTALLING PIPING MUST BE CERFIRFID AS HAVING BFEN SERVICES NECFSSARY FOR OR REASONABLY INCIDENTAL TO THE SATISFACTORY I GILBARCO SiNGLE SATELLITE U G,c� <br /> A SUITABLE INSTRUMENT (WOODEN MAI-LFT, ETC,), <br /> COYPI,FTl(')N Or ALL NORK SHOWN ON, CAL1,FD FM OR REOUIRED DY THF <br /> TRAINED BY SMITH FlPER(,3LASS 1 GILBARCO TS1000 CONSOLE <br /> D P AN�N(,3 THE ENDS OF BRASS TUBE SHALL BE COVEPED "NITTA ALUYINUIV FC11- ------ <br /> I PRINTER, STAR WT`H CABLE U G,c� <br /> STEEL PIPING� ALL PIPING OTHER THAN FIBERGLASS TO EF BLACK IRON THEN PLA$TfQ FND CARS, AND FINALLY WRAPPED WHH A 11,301TARLE <br /> (GALVANIZED P�PF. IS NOT ALWWED), PIrE THREAD COMPOUND IS TO BE 9 ALL WORK SHALL BE PERFORQED IN ACCORDANCE WITH THE UNIFORM DUlt'DING H 55 E THERMOID s/VENTURf U <br /> "ODF <br /> PECFOR SEAL. NO / OR JOVAR ` FHE HEAVY ALL SIFEL PIFE BELOW C(.)DE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL C -_ CALIFORNIA TAPE. - G,C <br /> GRADE IS TO BE DOUBLE WPAPPFD WITH 10 VIL PVC FAPF IJNC)FPGROIJN0 STORAGE TANK RFf,,,IJLATIONS, OSHA CONSTRUCTION SAFETY C)RDEPS, 24 UNLEA0ED NOZZLES OPW IlVr U G,C, <br /> AND ANY 01HER APPLICABLE STATE, CIFf, OR COUNTY OPDINANCES THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICF, <br /> FOR TRA�Spop,r TO A LABORArOPY, AGAIN, FORMAL 3 DIESEL II REUSE EXISTING ro�c, G,c� <br /> CHAIN--CF CUSTODY PECORDS) SHALI OF MAINTAINFID AND SUR-MITIED <br /> 20, INSTAILL NF\Y VENT RISERS AS SHOWN ON SITE PLAN (ABANDON EXISTING To rFi)mrs� 3 DIESEL NOZZLES REUSE EXISTING G�C, ol�C, <br /> FOR EACH SAMPLE <br /> VENT RISE'RS IN PLACE) INSTALL SWING JOINT") AT 80NOIA OF VENT PISERS 3 DIESEL. SWIVELS REUSE EXISFING G,c� G,C, <br /> PERMITS TO BE SECURED BY ULFRAMAR AND SUPPLIED TO C0NrRACr0P. <br /> IF' THE BOTTOM OF THE TANK IS BELOW' THE GROUNDWATER TABLE, THEN SOIL, <br /> 21, PIPING SYSTEMS SHALL BE' TESTED� CONTRACTOR IS RESPONS8 E FOR COMPLYING WITH ALI., PERMIT SAMPLES ARE NOT REQUIRED� IN THIS CASE� A WATER SAMPLE SHALL BE BRAVO ADVAN rAGL MPO 3 PRODLICT <br /> 2" - 50 PS�l AND APPLY SOAP S(,'�j CONDRIONS ADDITIONAL, PERMITTING WORK PY FHE CONTPACTOR TO RE, COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF THE GROUNDWATER IN 4 <br /> _UT�(DN' CONTAINMENT BOX FOR GILBARCO W/DOUDLE U G,C, <br /> Y + 15,,'� ON ALI- FEFS PAID (RECEIPTS REQUIRED,) <br /> 3" ­ 40 PSI AND APPLY SOAP SOLUTION, THE EXCAVATION, A CHECK SHALL INITIALLY BE MADE FOR ANY FREE POPPET SHEAR VALVES <br /> 3" SECONDARY - 5 PSI AND APPLY SOAP SOLUTION, 11 , GENERAL CONTRACTOR SHALL Vl',--)IT SITE AND FAMI( 1APIZE HIMSELF OF ALL FLOATING PRODUCT, IF NO FLOATING PRODUCT IS DETECIED, THEN A WATER <br /> SAVIPLE SHALL BE TAKEN WITH A DEVICE DESIGNED TO RFDUCE THE LOSS OF BRAVO CONTAINMENT BOX w/DOUBLE POPPET FOR <br /> EXISTING CONDITIONS PRIOR TO SUBVIITTiNG� HIS Bit), U (71,C, <br /> N OT E� YARK PRESSIURE ON G�AUIGE vVITH Ei,,ECTRICAL TAPE' AT BEGINN'ING, OF VOtATILE COYPONENTS, A BAILER IS A SUITABLE SAMPLING DEMCE, THE DIESEL DISPENSER - EXISTING <br /> TES"I, "PRESSURE (AS INDICA-TED ON GAUGE) SHALL HOLD FOR ONE (1) HOUR WATER 'SAMPLE SHALL BE IMMEDIATELY POUPED INTO A VOLATILE ORGANIC <br /> AND BE WITNESSED BY ULTRAVAR EN(,';I'NEER. 12. GENERAL CON'TRACF0IR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN ANALYSIS (VOA) VIAL wirl-4 AS LITTLE AGITATION AS POSSIBLE, A TEFLON BRAVO CONTAINMENT BOX v/DOU8LE POPPFT FOR <br /> UNLESS' NOTED OTTIFPWiSE, CONIRAC10F? SHALL REPAIR (,)R REPLACE TO THE SEPTUM '5HALL BE USED TO SEAL, THIS VIAL, U G,c, <br /> SATISFACTION OF THE ULTRAYAF? REPRESENTAIK/F' ANY EXISTING FAC'ILITIES GILBARCO DIESEL SATELLITE <br /> 22� CONTPAC"IC)R SHAL, PROV'DE DO"`�_YENlA"J�ON OF A DYNAVIC BACKPRESSUPE THAT ARE DAVAGEC) 13� THE CONTRACrof,��,,� OPERATIONS, <br /> TEST OF ALL VAPCR RE-iURN LiNES AS REQUIRED BY LOCAL. REG��LATIDNS SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL, HYDROCAPBoNS PY #4 MYE 1-1/4" ST FOR 3/4" CONDUIT FOR <br /> THE MCTI.40DS OUTLINED IN "GUIDELINES FOR ADDIRESSiNG FUEL LEAKS ­ - - - u <br /> 13, AIl EXCAVATIONS SHALL BE PERF'ORMED IN COYPLIANCE INITI­1 0SHA AND STATE ELECTIRICAL TO DISPENSER <br /> 23� C10,"�TRAC"T01P SH,IMLL DO ANY C)Trfl,,R,' TI-STING AS RECJiRED BY LOCAL. RF"GULATIONS CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, SAN FRANCISCO PAY <br /> EXC',EP7 F,NAL FOLL. SYSTEV S rFST THAT WILL BE ARRANGED C,3Y ULTRAMAR). R,EG U L.A T 10 NIS, THE CONTRACTOR IS REFERRED -TO 1HE OSHA BOOKLET, REGION -- SEPTEMBER 1985", BULKHEAD FITTING FOR VAPOR RETURN AT <br /> PRACTICE'S GUIDE 4 u 0XI <br /> FOR, PERFORMING EXCAVATION WOR�`,' -5, FOR A SAFE W(' R DISPENSER #0H 1 112 NPT <br /> LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UP ON SAVE� <br /> 2 4, PRESS�,�RE, (5 LRS,/ ON THE� NG SECONDARY ""'PACE SHA,.L BE MAINTA.1,""'D <br /> UNTL AF7ER, IHE CONCRETE TANK AND DRNE SLABS HAVE BEEN PO"RED AND 14, UPON COMPLERON OF PRO 'ECT, CONTRACTOR SHALL PROVIDE ULTRAMAR W�TY I "AS DAY AS REMOVAL, UNLESS THE 'TANKS I-1AVE BEEN TRIPLE RINI-,,ED, THE SUYP PENETRATION BOOTS, FOR U <br /> I l I CARRIER MUST BE A LICENSED WASTE HAULER AND MANIFESTS VUST AC 12 ...... G,C. <br /> SHA:,.i,. BE 'W�T,,ESSED BY TH�E ULTRAYAR ENGINEER, BUILT` DRAWINGS OF' ALL ITEMS iNSTALLED BY SAMC, "AS BUILTS" SHALL BE C OM PANY' CCINDUF�l WESTERN FIBERGLAS$ <br /> THE TANKS, <br /> COMPLETED ON--SIfE WITH INFORMATION NOTE[) DIRECTLY ON APPROVED JOB 3" DIA. SUMP PENFTRATION BOOTS, WESTERN <br /> 25, CONSTRUCT NEW FUE, ISLANDS AS SHOWN ON DRAWiNGS. C 0 PY 0 PIRNIQ, u Glo, <br /> FIBERGLASS <br /> --------------- <br /> 26� BRAVID BOXES, TURB�NE SUMPS, AND OVERFILL BOXES ARE 'TO BE WATER IESTED 15, CONTRACTOR SHALL PROVIOE A WORK SCHEDULE TO ULTRAMAR _EFQ, BEGINNINC, <br /> 'u � 3 1 REMOVAL Of" PIPING <br /> AS FOLLOWS: 'WORK, 51JPFLIED BY NEW OWNER <br /> ', , FILL WITH WATER TO HICHESr I'dENETRATION. 16 C0NrRACr0R SHALL PROVIDE A LIST OF SU(3--CONIRACTORS, IF ANY, WHO WILL PIPING TO BE REMOVED SHALL BE EVPTIFD OF ALL CONTENTS PRIOR TO <br /> 2, SPRAY PAINT TGP OF WATER, BE USED ON THE PROJECT, REMOVAL, PIPING, SHAL-L PF BLOWN OUT C,AFPED AT BOTH ENDS, <br /> 2 7, CONFRACTCR, SHALL COORDINATE ALL INSPEC17IONS AND AP R I S Pr IN <br /> 2 REPlj�Clf DISPENSER CON'DUIT AND CONDUIT TO CANCPY UGHTiNG� 17 1 P OVA, AN ) A I , <br /> CONDUIT FOR FUTURE CARDREADERS AND OTHER SITE ELECTRICAL AS 1111DICATED AT FHE COMPLETION OF THE PR'OJECT, ALL CERTIFICATES REQUIPED TO PUN rHF <br /> ON Sf��E PLAN AND DETAIL, INSTALL, N"rERCOM CONDUIT AS NIDICATED ON FACILI"I'y <br /> SITE PLAN AND DETAIL, <br /> 28, ALL CONDUIT 15 TO BE 3/4- (MINIMUM) RIGID CONDUIT, ORAWNG /SSUC0 FOR DAFF A&S OCAC01 REVISIONS <br /> --7-_TY <br /> OFACON FNGINEFR 77 A TF COVYENTS <br /> -------._-_-_-l__------- lotramar <br /> 5 TEE1 FA PRICA TOR 525 WEST THIRD STREET, HANFORD, CALIFORNIA 93230 <br /> NAA4F: ......... <br /> ----------- .............. <br /> PI ANNING ....... SCOP OF WORK <br /> .............................. <br /> per�mt r <br /> PLANS PREPARED BY: -900 S, CHEROKEE LANE <br /> 610 CON77?ACr' DOCUMENT N I A <br /> "mmmmomwwmmw LODIP CALIFOR <br /> NOF FOR CONS7RUC770N A & IS ENOINEERING <br /> 2A Illff <br /> 0, <br /> ORN <br /> o CONS rRUC RII PLANNING ENGINEERNG CONSTRUCTION MANAGEMENT SCALE: NO SCALE <br /> 9 00 NOT USE' FOR CONST, & & 695 <br /> CL (JNtC5,5 f0rH 51G, ARE IN HANO 2()7 WEST ALAMEDA AVENUE SUITE 202 DATE: 11 /10/93 <br /> o ___-__-, a - <br /> Q BURBANK, CALIFORWA 91502 <br /> DWIN, BY� J,L,HERBSF DRAWIN7 # T- 1 <br /> 7RF(COR,00�ORA WNG PLIONE: 818-842-3644 FAX: 818-842-3760 __I- <br /> X CHKD, BY- SHEET 3 OF' 7 <br />