<br /> EQUIPMENT LIST
<br /> OTY DESCRIPTION FURNISH INSTALL
<br /> BY BY
<br /> 20,000 GALLON COMPARTMENTALIZED DOLIBILE-WALL
<br /> SCOPE OF WORK U G
<br /> UNDERGROUND TANK CLOSURE PLAN
<br /> UNDERGROUND TANKS SPLIT (10K GALJ10K GAL,)
<br /> 6' HIGH CHAIN LINK FENCE POST "KEFP OUT" 29 INSTALL MONITORING S�'STEM WIT'H LIQUID SENSORS IN EACH TANK ANNULAR TANKS BY MUSCO,
<br /> 1, FENCE OFF' WORK AREA WITH
<br /> SIGNS ON FENCE EVERY 30 FEET, AT THE END OF' EACH WORK DAY SECORE SPACE AND IN SUVPS� INIST'ALL VONITOR CONTROL PANEL IN EXISTING
<br /> BUILDING AS DIRECTED BY OWNER 20,000 GALLON COMPARTMENTALIZED DOUKE-WALL
<br /> FENCING PANELS TOGETHIER, 111) _AEQ_Rm_Ar!_o,_ - _ DI G,C,
<br /> 30 INSTALL, NEW CONCRETE TAN�< MAT AND OTHER CONCREfE AS INDICATED ON SITE UNDERICIROOND TANKS SPLIT (12K GAL,/8K GAL,)
<br /> 10'--8 112" DIA,) TANKS BY TRUSCQ�
<br /> 1�l LOCATION OF' IANKS BEAC(
<br /> 2, FI-LISH, CLIT, AND REMOVE PRODUCT LINES FROM EYISTING TANKS TO DISPENSER PLAN, CONCRETE TO BE INSTALLED Al"XORDING TO UL-TRAMAR CONcRETE )N STATION fl695
<br /> ISLANDS, SPECIFICATIONS, DRIVE SLAB TO BE 6' rHICK, DIESEL DRIVE SLAB TO BE 8" THICK 900 5, CHEROKEF LANF
<br /> TANK 5LAB 15 TO BE 8" �FIICK, SEE SITE PLAN ANO DETAIL ',-3HEFT_. LODI, CALIFORNIA 1 1/2 H,P RED ,JACKET SUBMERGED PUMP #PI50SL G�c
<br /> 4
<br /> BURIAL OF 10'--8" D)A, TAOK BY IROSCO
<br /> 3 REMOVE ALL EXISTING FUEL. DISPENSEF`�'S, ISLANDS, BARRICADES, FUEL LINES, QQ,N�TAIN, P QUNV5__QE_,lWE�_
<br /> ASPHALT AND CONCRETE SURFACES AS REQUIRED, IN PREPARATION FOR INSTALLATION 1 2 OWNFR: ULIPAVAR INC,
<br /> INGS, ANY SALVAGEABLE FQIJIF)MENT TO RIF REMOVED 525 WEST THIPD STREE-f SUB PUMP RELAY CONIROL'BOX #880-030
<br /> OF NEW AS SHOWN ON DRAW 4 U G�c.
<br /> FROM SOF AS D:RECTFD BY 1,,'LTPAMAR RFPRESENTATiVF 3 1 Nsrkl NEW GILBARCO VPD DISPENSERS AND CC)NSC)LE AS INDICATE0 01`4 SITE CA 932,kO FOR 1 1/2 I4,P SUBMERGED PUMP.
<br /> PLAN AND DFSCRIBED IN THE EOUIPMENT LIST 1,3 PROJECTED CL0';IJRF DATE, To F 4 RED JACKIET LEAK DF,' IECTOR, u G,rlI
<br /> 3F DFIF-RVINIFT)
<br /> 4, _$f -) , -
<br /> K -Q 36" BOUND MANHOLE w112" SKIRT FOR SUBMERGED
<br /> SHORING TO BE NlINIVUV 20' AND DRIVEN "TIGHT". 1 4 TANK DATA 4 ------- U G,C,
<br /> PUMP, PGVECO
<br /> B� GENERAL CONIPACIOR, 32, AFTER THE TANK SLAB IS POLIRLD IFIE' CONTRACTOR SHALL REAPPLY VACUUM TO
<br /> THE TANK ANNULAR SPACE AND SHALL MAKE ARRANGEVIFNITS Fe,)R!, HIE IJt,TPAYAP
<br /> NVIVULR, QALLQN5 MAJURIAL-, 4 4`x2"x2" EXI'RACTOR VALVE, DPW U 01,0
<br /> 5. PREPARF I`_OR REMOVAL AND REMOVE F-CIOR (4) EACH, 20,000 GALLON EN(,',INF,,FR TO WIP�FSS IT,
<br /> GRO �ND 6951_1 20,QQO SlEEL IJ N L EA D ED GASOLINE OPW u G C�
<br /> UND�.',-ROR01-IND C�ASOLINE SI'ORAGE TANKS IN ACCORDANCE WITH THE U lNp� R L 3 4"x2`w3" EXTRACTOR VALVE
<br /> 7 � SHOWN ON SIiF FlAN, �[AN, FTr'
<br /> TANK T.,'I,.0SUI?E PLAN ULTPAMAR INC, WILL FVPrY` TANKS (,',,F REUSABtF PRODUCT 33 N' TALA ANY OTHER ITEMS A' PF T R 0 F I,)v P 69,5--2 20,000 S T EE L UNLEAUED P�,U 5 A',",,C.) F 7 4" BRASS EXTRACTOR CAP, OP* tj G�c,
<br /> GENERAL (,,,0 N r RACT 0 R r 0 PROVIDE FOR DRY ICE TO PURGE TANKS, b 0 T NO L 695-- 3 20,000 O)TEEt SUPER i I NJ I fl'A U F (,,,A (�D I I N1
<br /> 'I IFY, "FOR, `�,,HALL PROVIDE FOR 12" ROUND MANHOLE FOR VAPOR RETURN
<br /> THAN 25 LAS PER 1,000 GALLONS CAPAC CONTRAC F�9 5 4 20,000 17�1 F r
<br /> TRANSPORTATION, C�ISPOSAL (-)F' TANKS ANT) RINSEAlE wITF-I 11 & H SHJ� SERVIC''E, �5 4 PAP-I-i PAVING 4 0 P,W`--1-04A--12 U G G,
<br /> ER�CKSON'S OR OTHER AS APPROVED O'� IHE I.AIRAKIAR PROJECT EN(,,',INF E P 1.5 HISTOR'f, UNKNOWN .......
<br /> PIRW)IR TO BID -- CUTTING TANKS ON SITE WILL NOT BE ALLOWED. AIJ, AREAS TO BE PATCHED III OF III-1 PAVFYFI,,IT PREAKFp
<br /> SOT'APF, (�',IJT W 16" ROUND MANHOLE w/SCREWS AND GASKET, FOR
<br /> OR CONCRETE SAW 6 1-1--...........
<br /> ANNULAR SPACE YONITOR, POMECO #1IQ. 16WT G C,
<br /> 6, CONTRACTOR 51iALL PROVIDE FOR CLEAN�NG AS NECESSARY, TRANSPORFAF:ON, ---------
<br /> I') �) - tC -G b EXCAVATF ALL AREAS TC) A DEPTi-I OF 6" AND REF)tACIF WOH 2" AC OVER ( ENFRAL! TO BE DF"'TERVINED FILL, SPiLl- CONTALNME,NT MANHOLE,
<br /> Ci"PO,`�">AL Or TANK'3, AND RINSEATE IN A(,,,CORDAN F WITH COUNTY RE W AT:IONS 4" CRi.)SH ROCK OR C0NICRETE RASIT u G�c,
<br /> AND LILTRAMAR APPROVAL, Tj_F OPW-1 (5 GALLON)
<br /> LEAK DETECTION MON11ORING, CONSOLE FOR TANK
<br /> 7, �jL,TRAVAR, �VLL CONTRAC7 WIFH AND FURNISH C,'ONSU�L`,'ANTS TO PERFORM SOIL PA�CH FAVE FOR DISTANCE OF' 2' AROUND ALL NEW CONCRETE, PRODUCT REMOVAL� INC,
<br /> ANO W/O'E.R TESTIN3 UPON TANK Fl,'EVOVAL IN ACCORDANCE WITH TANK CLOSURE 1 ANNULAR SPACE SECONDARY CONTAINMEN�j,._,. I U G,c�
<br /> 'Ai ------
<br /> PLAN AN'D 0C I REGu,_,A'Tl0lNS, ALLOW T'NENTY-FOUR mOURS FOR RESULlS OF' 35 ULFRAVAR WILL HIRE 01HER'S TO DO f`ANK AND LINE PRECISION TES11NGI BOTFO MIS PEYOVAL- f L F: GILRARCO TM4
<br /> SOIL SAYPLES,
<br /> 36, NOTE� ANY ENViRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF TANK HAULER T L F� GILBARCO INTERSTITIAL FLOAT SWITCH FOR 4'-12'
<br /> 8, ONCE S 1`10YPLE-7, C&IJRACTOR IS RESP(0NSlL3LE FOR REMOVING NORK SHALL BE DONr ON A TIVE AND MATERIAL'_.'� BASIS, RENTAL RECEIPFS, 2 U G,C,
<br /> DIAMETER STEEL TANK
<br /> ALL EXiSTIiNG BACKFILL VA,i'ERIAL TO ACHIEVE A `SQUARE,� CUl' HOLE� SUIBCONTRA'CTOR INVOICES, YATERAL RECEIPTS, AND CA10' LABOR TIYE S41EETS GEOLOGIST TO FIE DETF"RYINFD
<br /> SHALI,, E,,E REQIJ��RED TO SUIPPORT GENERAL CON�'RACTOP TIME AND YAr[RAL I'E',S)TING I-ABORATORY 4 GILBARCO TURBINE SUMP/SENSORS U G�C,
<br /> NVOICFS, SUC,14 WORK SII/�LL BE PiLLED SEPARATELY, r-,____________,__" 11__l__,____ll_,
<br /> I �GILBARCO 2" DIA RISER CAP KIr FOR
<br /> 9, Co�,m��v"�-c�i:�� S�,V�L.�_ (--,-)VrR EXCAVATED SOIL W�TH At V1, PLASTIC UNTIL So�L,
<br /> R
<br /> IS IREMI'Vlt."-D S(-lh, 70 t3E, STOCKPlED 0,`,� SITE F01 SAVPIJNG PRIOR TC) TANK DISPO�Ai FACILJT`Y� TLF� 2 u G,C,
<br /> �l �1. T RAVAIR, INTERSTITlAl. SENSOR
<br /> OFF-HAOL AS I)'RE(,'71:,,) 13Y UL 2 1) Y A I
<br /> _QY 1 5%2`,y24" FLEXIBLE PIPE CONNECTORS FOR
<br /> 10, ,;�...T RAY A Sr,,AUL. P;RGVIIDE FOR TRA%SP'DR7ATIO'� AND' D�SPC)SAL OF EXCAVATEED 19 u G,c,
<br /> Sol A�71EIR COVIPI-ETION OF A\4Y NECESSARY' RF_9EDATIONI, NCLUDiNG AERATFION, 2,1 rAN K'", DISPENSERS (5'VYIVEL I END)
<br /> G,EN_ER A,_L_N_0_TE_S�:_,_ 3" x 30" LONG CONTAINMENT TECHNOLOGIES
<br /> I "I , CONTRACT,�',;R TA,<E EX7REV,E CAJTION C�:JRI'\,G EX,,'_',AVA'Ti0N \,C,T TO REMOVE ALL, PRODUCT F'Rom TANkS 15 u G,c�
<br /> SECONDARY CONTAINMENT BOOTS
<br /> �,)E`OPARD�/E NTEEG�` CF �-I`: ENVRONMENTAL EXTRA�'TiGN UNES AND
<br /> WELLS THE CONTPACTOR iS RESPONSIBLE FOR RESTORING 7 REMOVE ALA, RESIDUAL LIQUID, SOLIDS, OR SLODGIES,
<br /> I FHE SYSTEM" 1, CONTRACTOR EVPLOYEES TO) HAVE COMPLETED 40 HOURS OSHA 'TRAINING COURSE 18" LONG FLEXIBLE PIPE CONNECTORS FOR
<br /> TO A PRECO,"45711,UCT�0N SIATE, PRX)R TO THE START'OF W(ORK, CEPTIFiCAlION OF TFIIS MuST BE PROVIDED TO I L) u G,C
<br /> THE ULTRAMAR ENGiNEER PffRIOR TO FHE STAR"] OF WORK, PURGE ALL VAPORS FROM TANKS WITH A NAINIYUM OF TWENry -FIVIE, (25) Poi,)NDS T-A-NKS- (SWVE I 1, 1-1-E I IND) ------
<br /> OF" SOLID CARBON DIOXIDE (DRY' ICE) FOR EACH 1,000 GALLONS OF TANK x 18" LONG FLEXIBLE PIPE CONNECTORS FOR
<br /> 2, EXCAVA,rE AS NECESSAR" FOR TH E INSTALLA�;C)N OF REPLACEVIENT TANKS. 2, CONTPACTOR, EMPLOYEES 10) HAVE COMPLETED SMITH FIBERG�.ASS RED THREAD IIA CAPACIFY AND PRESENT SALES St-IPS, TO INSPECTOR, PELLETIZED DWI` ;CE IS LII G.G,
<br /> TANKS
<br /> 3, CC NTRACTOR SHALL PLACE SOIL W�TH 4 V)L. PLAST�C uN7�I, SOIL I ; RF"YOVED, TRAINING (CERTIFICATES REOJJIRED), RECOMMENDED CAP ALL OPENINGS EXCEPT VENT PIPE AND ALLOW TWO HOUR
<br /> 5041 TO BE ',;TOCKP�LED 'AND SEGREGATE-D ON SI[E FOR SAMPLING PRIOR TO YINIMUM AND SIX HOUR MAXIMUM OR OXYGEN DISPLACEMENT AFTER PUTTiNG 41' DROP TUBE, OPW #61 --SO--C410, OVERFILL
<br /> OFF-HAUL BY OIkiERS AS D;RECTED BY I)LlRAVAR, 3 CONTRACTOR _10 HAVE BFEN� TRAINED BY TRUSCO TANK IN, TANK !NSTALLAI�ON CARBON DIOXIDE INTO THE rANFS VENT PIPE OPENING l'O BE CHECKED WITH
<br /> 4 PIRLVENTION VALVE FOR 10'-8' DIA, -TANK BY
<br /> (ULTRAMAR WILL VERIFY WiPH rROSCO) CONTRACTOR SHALL COMPLETE THE A COYBUSTIBLE GAS DETECTOR TO DETERYINE IF TANI< IS VAPOR FREE OR )F 11___l.____ll I'�-11-1�l-.,.-",-�-"--,-,--"-,--,--,--l-l��-------,��,-�---,-'I �t u G C�
<br /> 14, UL-RAVAR SHALL PROVIDE FCR TRANSPORTATION AND DiSPOSAL OF EXCAVATED TANK 1NISIALLATION CHECKLJ!ST (SUPPLIED TO CONTRACTOP BY' TPUSCO ()URING ADOITIONAL DRY ICE AND/OR TIME MAY BE REQUIRIED TRUSCO
<br /> SOIL AFTER COMPLETION OF' ANY NECESSARY REMEDIATION, INCLUDING AERATI0,N, TANK 0ELUERY) AND SHALL FURNISH -TO ULTRAYAR 4 4" 'TWO POINT FILL ADAPTOR, OPW #633T-8075 u G�C�
<br /> PLUG OR CAP ALL TANK OPENINGS LEAVING AN 1/8" - 1/4" PRESSURE REDEF
<br /> CONI'RACTOR TO DEVELOP k SPECIFIC SITE SAFETY PLAN FOR TANK REVIOVAI.- AND HOLE IN ONE CAP AT THE TOP OF THE rANK, 4 4" TIGHT FILL CAP, OP'N #634TT-,7085 u G C.
<br /> 151 INSTA�A_ "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES PEP, 4 TAINK INSTALLAT'ION PRIOR DO FHE START OF 'NORK� CONTRACTOR WILL CONDUCT
<br /> DRAWINGS VISUALLY NSPECT THE TANKS UPON REMOVAL,, ALL EXTERNAL TANK SURFACES 4"xY VAPOR RECOVERY TWO POINT ADAPTOR
<br /> WEEKLY JOB SITE SAFETY MIEETINGS WITH IT'S FyPLO'YFES AND THE MEETING, 3 U G,c�
<br /> YINtJTES WILL BE SHIPPED "TO ULFRAMAR, AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLE�-,) OR LEAKAGIE, OPW #1611 AV-1620
<br /> THE REI5ULTS OF SUCH INSPECTION SHALL BE DOCUMENTED IN VIRITING, WIFI,4
<br /> 16, INSTALL TWO (2) EACH 20,000 GALLON COMPARTMENTALIZED TANi�,S 4" VAPOR RETURN TOP SEAL CAP,
<br /> PER DETAILS ON DRAWINGS AND PER MANUFAClURFIR'S li,,4STRUCTIONS, -TANK 5 CONTRACTOR SHALL HAVE TI+�E FOLLOWING LICFNSES� PHOTOGRAPHS WHERE APPROPRIATE, OPW #711-T-7065 U G,C�
<br /> BEDDIN(3 AND BACKFILL 1'0 BE PEA (-,RAVEL. 'TANK DURY IS TO BE vlNImuy a, GENERAL ENGINEERING "A"
<br /> 4 FE!`,"T TANK BEDDING, IS Fo BE A MINIMUM 12", SPACING BETWEEN TANKS IS TO b, HAZARDOUS MATERIAL SUBSTANCIE HANCILING, FILIER FABRIC, TYPAR OR EQUIV., FOR TANK
<br /> E T I,)R !_s -WO BENEATH THE TANK, ONE FROM ALL
<br /> BE A M�NIMUV OF 1W, TANKS TO E SLOPED 2" TO 3" W171-i �BIN� AT IHE I )OIL, SAMPLES SHALL, BE ANALYZED FROM
<br /> HOLE AND IRENCHES, TYPAR OR EQUtV,
<br /> HIGH END, 6, CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE, CONTRACTOR 5HAILL, HAVE DIRECTLY BENEATH THE FILL PIPE, THE OTHER FROM A SIMILAR POSTION AT
<br /> �U f 'UCFA INSURANCE ON FIII,E WITH ULTRAVAR BY NAMING ULTRAVAR AS THE OPPOSITE END OF THE TANK, IF' OBVIOUSLY STAINED OR CONTAMINATEID
<br /> PROOF OF' 'S 4 FIBERGLASS TURBINE SUMP w/COVER BY IRUSCO u G.c,
<br /> ADDI-HONAL INSURED," AREAS EXIST IN LOCATIONS OTHER THAN THE ABOVE LOCATIONS, THEN
<br /> 17� INSTALL- EQUIPMENT AS LISTED IN EQUIPYENT LISF INCLUDING SALVAGEABLE ADDITIONAL SOIL SAYPLES SHALL FIE ANALYZED FROY THESE OBVIOUSL,Y F9EIRGLASS PRODUCT, VAPOR & VEN'"T',P I P I N G,,
<br /> STAINED OR CCNTAMINATED AREAS BY ULTRAMAR,
<br /> EOUIPMENT TO BE REINSTALLED, IF ANY 7. CONIRACTOR SHALL HAVE TF`IE FOLLOWING3 INSURANCE, CONTRACTOR SHALL HAVE ALL SECONDARY CONTA�NMENT PIPING & MISC� G,c� G,C
<br /> PRQOF OF SUCH INSURANCE ON FILE WITH OLTRAVAR BY NAMING ULTRAMAR AS
<br /> SOLL SAMPLES ',".,HALL BE C01-LECIED FROM THE NATIVE SOIL AT OR JUST BEL��,),A/ FITTINGS PER SPEC'S, IN SCOPE OF WORK
<br /> 18� INSTALL NEW FIBERGLASS PRODUCT, VENT, VAPOR, AND SECONDARY CONTAINMENT 1\usn iNSIJRF"D," THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. SAMPLES SHALL EIE
<br /> LINES PER SITE PLAN, STANDARD TANK DRAWINGS, AND PER SCHEDULE BELOW� B(_ACK IRON PIPING, NIPPLES & FITTING..; WHERE
<br /> 0 EMPLO�EES LIABILITY WITH A MINIMUM LIYIT OF LIABILTry OF TAKEN USING' A DRIVENTU8E TYPE SAMPLER, CAPPED AND SEALED WITH INEFf ALL G,c G,�c
<br /> $1,000,000 FOR EACH OCCURRENCE, MATERIALS, FORYAL, SK3NED CHAIN� OF-CLISTODY RECORDS SHALL BE SHOWN IN DETAILS FOR GASOLINC PIPINGS,
<br /> 19, PRODUCT PIPING� 2" RED 'THREAD HA AND RFD TI-ARCAD 11 FITTINGS, DS 8000 MAINTAINED FOR EACH SAMPLE AND SUBMITTED WITH THE RESULTS Tl',,) rT-IE 4 ISLAND FORMS 4'x7' DOGBONE FOR MPD'S (TYP.) C,
<br /> SERIES ADHESIVE. ALL JOINTS MUST BE CURED USING SMITH FIBERGLASS CHEV 0 COYPREhENSIVE GENERAL L�AB I LI FY, INCLUDING CONTRACTOR'S REGULATING AGENCY BY ULTRAMAR,
<br /> CURE PAKS, I ISLAND FORM 4'xl2' "STRAIGHT" W/RAISED ENDS u G,0,
<br /> PROTECTIVE LIABILITY, COMPLETFID OPERATIONS LIABILITY, ANO
<br /> CONTPACTUAL LIABILITY, WITH A COMBINED SINGLE LIIII OF To EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOWING ALTERNATIVE I ISLAND FORM 4'x7' "STRAIGHT" w/RAISED ENDS U G,C�
<br /> VENT" P!PING� SAVE AS ABOVE NOT L.ESS THAN $1,000,000 PER OCCURR[NCE FOR BODII-Y SAMPLING METhOD MAY BE USED� ........-------
<br /> GILBARCO ADVANTAGE 6 HOSE MPD, 3 PROD� 1,
<br /> �l 2" AND 3" PIPING AS NOTFD INJURY AND F"ROPERrY DAVAGE-
<br /> VAPOR PIPIN(3 SAVE AS ABOVE WIN IMMEDIATELY UPON REMOVAL OF THE TANK, A PACKHOE BUCKE-T OF BACKLIT BRAND PANELS, CANOPY, FULL VAPOR
<br /> 0 N PLA N S AUTOMOBILE LIABILITY COVERING USIF OF ALL OWN[D HIRED NATIVE SOIL SHALI RE TAKEN FROV THE NATIVE POJL/BACKFILL ---------------
<br /> IN�ERFAGE. THIS SOIL SHALL HE RAP�DLY DROUGHT TO THE 4 FOR BALANCE SYSTEM INCL, OPW 11 VF NOZZLES, U (1,C,
<br /> SECONDARY' VEHICLES WITH A COMBINED SINGLE LIMIT QF SINGLE UNIT OF' 51.)R FAC F,
<br /> P P 0 D u I' LIABILITY OF NOT LE9S THAN 1,1,000,000 PER OcCILIPREHCE FOR PHERMOID T-15" VENTURI HOSES,
<br /> PIPING 3" RED THREAD IIA AND RED rHREA[) II FITTINGS, DS BODILY IN,JURY AND FIROPERrY DAMAGE APPROXIQATELY THREE INCHES SHVLL BE RAPIDLY SCRAPED AWAY YLEELD
<br /> 7000 OR 8000 SFRIFS PDHESIVF, 8, GENERAL CONTRACTOR TO FURNISH ALL LABOR, MATERIAL FROM THE 5URFACE OF' THIS SOIL, THAN A CILEAN BRA5)5 TUBE (AT I GILBARCO DUAL -- REUSE EXISTING G,C, (3,C,
<br /> F_0UIPYENT, AND LEAST THREE INCHES LONG) SHALL BE DRIVEN INTO fHF SOIL WITH
<br /> NOTE: PEPS01I INSTALLING PIPING MUST BE CERFIRFID AS HAVING BFEN SERVICES NECFSSARY FOR OR REASONABLY INCIDENTAL TO THE SATISFACTORY I GILBARCO SiNGLE SATELLITE U G,c�
<br /> A SUITABLE INSTRUMENT (WOODEN MAI-LFT, ETC,),
<br /> COYPI,FTl(')N Or ALL NORK SHOWN ON, CAL1,FD FM OR REOUIRED DY THF
<br /> TRAINED BY SMITH FlPER(,3LASS 1 GILBARCO TS1000 CONSOLE
<br /> D P AN�N(,3 THE ENDS OF BRASS TUBE SHALL BE COVEPED "NITTA ALUYINUIV FC11- ------
<br /> I PRINTER, STAR WT`H CABLE U G,c�
<br /> STEEL PIPING� ALL PIPING OTHER THAN FIBERGLASS TO EF BLACK IRON THEN PLA$TfQ FND CARS, AND FINALLY WRAPPED WHH A 11,301TARLE
<br /> (GALVANIZED P�PF. IS NOT ALWWED), PIrE THREAD COMPOUND IS TO BE 9 ALL WORK SHALL BE PERFORQED IN ACCORDANCE WITH THE UNIFORM DUlt'DING H 55 E THERMOID s/VENTURf U
<br /> "ODF
<br /> PECFOR SEAL. NO / OR JOVAR ` FHE HEAVY ALL SIFEL PIFE BELOW C(.)DE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL C -_ CALIFORNIA TAPE. - G,C
<br /> GRADE IS TO BE DOUBLE WPAPPFD WITH 10 VIL PVC FAPF IJNC)FPGROIJN0 STORAGE TANK RFf,,,IJLATIONS, OSHA CONSTRUCTION SAFETY C)RDEPS, 24 UNLEA0ED NOZZLES OPW IlVr U G,C,
<br /> AND ANY 01HER APPLICABLE STATE, CIFf, OR COUNTY OPDINANCES THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICF,
<br /> FOR TRA�Spop,r TO A LABORArOPY, AGAIN, FORMAL 3 DIESEL II REUSE EXISTING ro�c, G,c�
<br /> CHAIN--CF CUSTODY PECORDS) SHALI OF MAINTAINFID AND SUR-MITIED
<br /> 20, INSTAILL NF\Y VENT RISERS AS SHOWN ON SITE PLAN (ABANDON EXISTING To rFi)mrs� 3 DIESEL NOZZLES REUSE EXISTING G�C, ol�C,
<br /> FOR EACH SAMPLE
<br /> VENT RISE'RS IN PLACE) INSTALL SWING JOINT") AT 80NOIA OF VENT PISERS 3 DIESEL. SWIVELS REUSE EXISFING G,c� G,C,
<br /> PERMITS TO BE SECURED BY ULFRAMAR AND SUPPLIED TO C0NrRACr0P.
<br /> IF' THE BOTTOM OF THE TANK IS BELOW' THE GROUNDWATER TABLE, THEN SOIL,
<br /> 21, PIPING SYSTEMS SHALL BE' TESTED� CONTRACTOR IS RESPONS8 E FOR COMPLYING WITH ALI., PERMIT SAMPLES ARE NOT REQUIRED� IN THIS CASE� A WATER SAMPLE SHALL BE BRAVO ADVAN rAGL MPO 3 PRODLICT
<br /> 2" - 50 PS�l AND APPLY SOAP S(,'�j CONDRIONS ADDITIONAL, PERMITTING WORK PY FHE CONTPACTOR TO RE, COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF THE GROUNDWATER IN 4
<br /> _UT�(DN' CONTAINMENT BOX FOR GILBARCO W/DOUDLE U G,C,
<br /> Y + 15,,'� ON ALI- FEFS PAID (RECEIPTS REQUIRED,)
<br /> 3" 40 PSI AND APPLY SOAP SOLUTION, THE EXCAVATION, A CHECK SHALL INITIALLY BE MADE FOR ANY FREE POPPET SHEAR VALVES
<br /> 3" SECONDARY - 5 PSI AND APPLY SOAP SOLUTION, 11 , GENERAL CONTRACTOR SHALL Vl',--)IT SITE AND FAMI( 1APIZE HIMSELF OF ALL FLOATING PRODUCT, IF NO FLOATING PRODUCT IS DETECIED, THEN A WATER
<br /> SAVIPLE SHALL BE TAKEN WITH A DEVICE DESIGNED TO RFDUCE THE LOSS OF BRAVO CONTAINMENT BOX w/DOUBLE POPPET FOR
<br /> EXISTING CONDITIONS PRIOR TO SUBVIITTiNG� HIS Bit), U (71,C,
<br /> N OT E� YARK PRESSIURE ON G�AUIGE vVITH Ei,,ECTRICAL TAPE' AT BEGINN'ING, OF VOtATILE COYPONENTS, A BAILER IS A SUITABLE SAMPLING DEMCE, THE DIESEL DISPENSER - EXISTING
<br /> TES"I, "PRESSURE (AS INDICA-TED ON GAUGE) SHALL HOLD FOR ONE (1) HOUR WATER 'SAMPLE SHALL BE IMMEDIATELY POUPED INTO A VOLATILE ORGANIC
<br /> AND BE WITNESSED BY ULTRAVAR EN(,';I'NEER. 12. GENERAL CON'TRACF0IR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN ANALYSIS (VOA) VIAL wirl-4 AS LITTLE AGITATION AS POSSIBLE, A TEFLON BRAVO CONTAINMENT BOX v/DOU8LE POPPFT FOR
<br /> UNLESS' NOTED OTTIFPWiSE, CONIRAC10F? SHALL REPAIR (,)R REPLACE TO THE SEPTUM '5HALL BE USED TO SEAL, THIS VIAL, U G,c,
<br /> SATISFACTION OF THE ULTRAYAF? REPRESENTAIK/F' ANY EXISTING FAC'ILITIES GILBARCO DIESEL SATELLITE
<br /> 22� CONTPAC"IC)R SHAL, PROV'DE DO"`�_YENlA"J�ON OF A DYNAVIC BACKPRESSUPE THAT ARE DAVAGEC) 13� THE CONTRACrof,��,,� OPERATIONS,
<br /> TEST OF ALL VAPCR RE-iURN LiNES AS REQUIRED BY LOCAL. REG��LATIDNS SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL, HYDROCAPBoNS PY #4 MYE 1-1/4" ST FOR 3/4" CONDUIT FOR
<br /> THE MCTI.40DS OUTLINED IN "GUIDELINES FOR ADDIRESSiNG FUEL LEAKS - - - u
<br /> 13, AIl EXCAVATIONS SHALL BE PERF'ORMED IN COYPLIANCE INITI1 0SHA AND STATE ELECTIRICAL TO DISPENSER
<br /> 23� C10,"�TRAC"T01P SH,IMLL DO ANY C)Trfl,,R,' TI-STING AS RECJiRED BY LOCAL. RF"GULATIONS CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, SAN FRANCISCO PAY
<br /> EXC',EP7 F,NAL FOLL. SYSTEV S rFST THAT WILL BE ARRANGED C,3Y ULTRAMAR). R,EG U L.A T 10 NIS, THE CONTRACTOR IS REFERRED -TO 1HE OSHA BOOKLET, REGION -- SEPTEMBER 1985", BULKHEAD FITTING FOR VAPOR RETURN AT
<br /> PRACTICE'S GUIDE 4 u 0XI
<br /> FOR, PERFORMING EXCAVATION WOR�`,' -5, FOR A SAFE W(' R DISPENSER #0H 1 112 NPT
<br /> LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UP ON SAVE�
<br /> 2 4, PRESS�,�RE, (5 LRS,/ ON THE� NG SECONDARY ""'PACE SHA,.L BE MAINTA.1,""'D
<br /> UNTL AF7ER, IHE CONCRETE TANK AND DRNE SLABS HAVE BEEN PO"RED AND 14, UPON COMPLERON OF PRO 'ECT, CONTRACTOR SHALL PROVIDE ULTRAMAR W�TY I "AS DAY AS REMOVAL, UNLESS THE 'TANKS I-1AVE BEEN TRIPLE RINI-,,ED, THE SUYP PENETRATION BOOTS, FOR U
<br /> I l I CARRIER MUST BE A LICENSED WASTE HAULER AND MANIFESTS VUST AC 12 ...... G,C.
<br /> SHA:,.i,. BE 'W�T,,ESSED BY TH�E ULTRAYAR ENGINEER, BUILT` DRAWINGS OF' ALL ITEMS iNSTALLED BY SAMC, "AS BUILTS" SHALL BE C OM PANY' CCINDUF�l WESTERN FIBERGLAS$
<br /> THE TANKS,
<br /> COMPLETED ON--SIfE WITH INFORMATION NOTE[) DIRECTLY ON APPROVED JOB 3" DIA. SUMP PENFTRATION BOOTS, WESTERN
<br /> 25, CONSTRUCT NEW FUE, ISLANDS AS SHOWN ON DRAWiNGS. C 0 PY 0 PIRNIQ, u Glo,
<br /> FIBERGLASS
<br /> ---------------
<br /> 26� BRAVID BOXES, TURB�NE SUMPS, AND OVERFILL BOXES ARE 'TO BE WATER IESTED 15, CONTRACTOR SHALL PROVIOE A WORK SCHEDULE TO ULTRAMAR _EFQ, BEGINNINC,
<br /> 'u � 3 1 REMOVAL Of" PIPING
<br /> AS FOLLOWS: 'WORK, 51JPFLIED BY NEW OWNER
<br /> ', , FILL WITH WATER TO HICHESr I'dENETRATION. 16 C0NrRACr0R SHALL PROVIDE A LIST OF SU(3--CONIRACTORS, IF ANY, WHO WILL PIPING TO BE REMOVED SHALL BE EVPTIFD OF ALL CONTENTS PRIOR TO
<br /> 2, SPRAY PAINT TGP OF WATER, BE USED ON THE PROJECT, REMOVAL, PIPING, SHAL-L PF BLOWN OUT C,AFPED AT BOTH ENDS,
<br /> 2 7, CONFRACTCR, SHALL COORDINATE ALL INSPEC17IONS AND AP R I S Pr IN
<br /> 2 REPlj�Clf DISPENSER CON'DUIT AND CONDUIT TO CANCPY UGHTiNG� 17 1 P OVA, AN ) A I ,
<br /> CONDUIT FOR FUTURE CARDREADERS AND OTHER SITE ELECTRICAL AS 1111DICATED AT FHE COMPLETION OF THE PR'OJECT, ALL CERTIFICATES REQUIPED TO PUN rHF
<br /> ON Sf��E PLAN AND DETAIL, INSTALL, N"rERCOM CONDUIT AS NIDICATED ON FACILI"I'y
<br /> SITE PLAN AND DETAIL,
<br /> 28, ALL CONDUIT 15 TO BE 3/4- (MINIMUM) RIGID CONDUIT, ORAWNG /SSUC0 FOR DAFF A&S OCAC01 REVISIONS
<br /> --7-_TY
<br /> OFACON FNGINEFR 77 A TF COVYENTS
<br /> -------._-_-_-l__------- lotramar
<br /> 5 TEE1 FA PRICA TOR 525 WEST THIRD STREET, HANFORD, CALIFORNIA 93230
<br /> NAA4F: .........
<br /> ----------- ..............
<br /> PI ANNING ....... SCOP OF WORK
<br /> ..............................
<br /> per�mt r
<br /> PLANS PREPARED BY: -900 S, CHEROKEE LANE
<br /> 610 CON77?ACr' DOCUMENT N I A
<br /> "mmmmomwwmmw LODIP CALIFOR
<br /> NOF FOR CONS7RUC770N A & IS ENOINEERING
<br /> 2A Illff
<br /> 0,
<br /> ORN
<br /> o CONS rRUC RII PLANNING ENGINEERNG CONSTRUCTION MANAGEMENT SCALE: NO SCALE
<br /> 9 00 NOT USE' FOR CONST, & & 695
<br /> CL (JNtC5,5 f0rH 51G, ARE IN HANO 2()7 WEST ALAMEDA AVENUE SUITE 202 DATE: 11 /10/93
<br /> o ___-__-, a -
<br /> Q BURBANK, CALIFORWA 91502
<br /> DWIN, BY� J,L,HERBSF DRAWIN7 # T- 1
<br /> 7RF(COR,00�ORA WNG PLIONE: 818-842-3644 FAX: 818-842-3760 __I-
<br /> X CHKD, BY- SHEET 3 OF' 7