Laserfiche WebLink
will be a cleanable, light colored material (either painted sheetrock or a drop- <br /> ceiling with Vinyl Rock panels). <br /> 3. All ice machines and bins, food preparation sinks, dishwashing sinks (dish- <br /> washing units), display cases and refrigeration units, and any other food service <br /> equipment which discharges liquid waste, shall be plumbed therein with an <br /> indirect connection through an air gap (height of air gap must equal two times the <br /> inside diameter of the discharge tube. H=2xl.D.) into a floor sink or other <br /> approved waste receptor. All floor sinks are to be positioned to be readily <br /> cleanable, accessible for inspections, and must be flush with finished floor. Do <br /> not place floor sinks inside walk in refrigeration units or cabinets. [CURFFL <br /> §114100 and §114150] <br /> 4. Adequate and suitable storage space must be provided for dry and cold storage. <br /> The following recommended methods may be used: a) A floor area equivalent <br /> to 25 percent of all kitchen space; b) Sufficient approved shelving of ninety-six <br /> (96) linear feet of shelving that is eighteen (18) inch deep, or c) 144 square feet <br /> of actual dry shelving area. <br /> 5. The walk-in refrigeration unit shall be flashed or sealed to adjacent walls and/or <br /> ceiling to exclude vermin. The unit shall also be designed to be closed and <br /> sealed to the floor or be constructed integral with the floor. When opened food <br /> containers are stored inside this unit, the flooring shall be continuous/contiguous, <br /> coved at the floor wall interface to a height of four (4) inches and a minimum <br /> radius of three-eighths (3/8) of an inch provided. [CURFFL §114040 and <br /> §114150] <br /> 6. The approved flooring that was discussed with the Joe Koslowski, the flooring <br /> contractor, and Roger Page on January 6, 2006 was General Polymers "TPM <br /> #115 Upgraded Troweled Mortar (U3/U4)" installed throughout. Under the <br /> cooking equipment in the hallway and at least 5 feet around the equipment you <br /> must include in the mixture the General Polymers "FasTop S Urethane Slurry <br /> System" in order to meet the minimum temperature resistance. Both floors must <br /> be applied at 3/16-inch minimum thickness throughout. Under the cooking <br /> equipment and at the floor-wall iunctions you must apply the slurry as smooth as <br /> possible for cleaning purposes. <br /> The EHD must be kept informed of the construction progress. A final inspection must <br /> be performed, operating permit fees paid, and approval to operate granted prior to <br /> opening for business. All equipment must be installed and thorough cleaning <br /> completed prior to the final inspection. Inspections must be scheduled at least 48 hours <br /> in advance. Charges for additional inspections, re-inspections and/or consultations <br /> may be assessed at the EHD hourly rate of $ 93.00 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in <br /> compliance with applicable State laws, and/or city or county ordinance codes, shall be <br /> Plan Check Approval -2- December 23, 2005 <br />