Laserfiche WebLink
TABLE 2 ESIDLAT£D OF TOTAL mAss OF TOIAL PETROLEUI jft-Le AF301S(IPH) <br /> IN SOIL. <br /> FORMER RrELAL STATION 604 <br /> 1448 N. El Dorado Street <br /> Stotlm, California <br /> DEPTH AMPLE ARES IN FEET CUBIC IN CUBIC IN fOTAL TOTAL TOTAL <br /> FS7.9 SURFACE VALUE Len&kidt Thic FEET YARDS TONS SASS 3N MASS IN POU,11)5 <br /> IH PPM TONS KU:1T6 <br /> IPH <br /> excavation 276 0.00027600 50 35 15 26250 972.12 973.72 0.27 537.49 <br /> 26'-40' D.000O,W 0 QA0 1.50 0.00 0.00 <br /> _ O.Doo06D00 0 0.00 1.50 0.00 0.00 <br /> pump island 0.00000000 0 0.00 1.50 0.00 0.00 <br /> Pl 3310.00033100 20 26 20 IM 370.37 371.87 0.12 246.18 <br /> 0.D0000000 0 0.00 1.50 0.00 0.00 <br /> pump island 0.00000,400 0 DAO 1.50 0.00 0.00 <br /> P3 4001 D.004000 20 25 15 7500 277.78 279.28 1.12 2234.78 3019.45 <br /> LESS PCD§Tis RECOVERED DURING PILOT TESL 1858.45 <br /> pound of charccal needed (.25 abosrobitan rating) 7433.81 <br /> number of 2040 pound carcoal reactors 3.72 <br /> number of 85 gallon tub scrubs (300lbs) 24.78 <br /> number of 10,000 pound dumpsters 0,743381 <br /> nunber of days using IOOcfm blover(59 lbs/day) 126.00 <br /> number of days using 2.160 cfm bIover(100 lbs/day-projected) 74.34 <br /> MORSE co <br /> excavation area <br /> EY veli 550 0.00055D00 50 35 5 8750 314.01 325.57 0.18 358.13 <br /> 276 0.00017600 50 35 10 17504 648.15 649.65 0.18 358.61 <br /> pump island 0.000000q 0 0.00 1.50 0.00 0.00 <br /> Pi 660 0.00066000 20 25 5 2500 91.59 94.09 0.06 114.20 <br /> 3310.00033100 20 25 15 7500 277.78 279.28 0.09 184.88 <br /> pump island 0.000D0440 0 0.00 i.50 0.00 0.00 <br /> P3 8000 0.ODBD0000 20 25 5 2500 92.59 %.09 0.75 . 1505.48 <br /> 001 0.00407100 2D 25 10 5000 165.19 166.69 0.75 I493,85 4025.16 <br /> LESS DUI'DS RECOVEREO DURING PILOT TESI 2845.16 <br /> pounds of charcoal needed(.25 absorbtion) 11460.63 <br /> number of 2000 pound reactors 5.73 <br /> number of 85 gallon tub scrubbs 38.20 <br /> 10,000 pound dumpster rented 1.146063 <br /> days to remove with 1D0 cfm blover (59 lbs/day) 194.25 <br /> days to remove vith 2.160 cfa blover(100 lbs/dayprojxted) 114.61 <br /> number of 10,000 pound duopster <br /> PILOT TEST <br /> TOTAL MASS THP MOVED DURING PILOT TEST 1160 <br /> TOTAL RSSS BENZ 2 RDIOVED DURING PILOT TEST 20.3 <br /> 17 <br />