R604 :UPDATE 9-MARCH, 1992 <br />• VAPOR RECOVERY RESULTS UNDER VARIANCES # 91-19 AND 91-20 . <br /> The vapor extraction system was shut down on November 21, 1991 <br /> upon completion of operation under Initial Variance #91-19 and 90 <br /> day Variance #91-20 . A total of 13 , 116 pounds of gasoline range <br /> hydrocarbons was removed from the soils and ground water beneath <br /> this site by that time. <br /> The vadose zone vapor recovery wells (P1 , P3-Swarm and EX) <br /> contributed little to the total recovered hydrocarbons during this <br /> time period, P1 = 1 . 3 pounds, P3-Swarm = 561 . 4 pounds and EX = <br /> 127 pounds, see Table 3A <br /> "RE-EQUILIBRATION" OF HYDROCARBON PHASE IN VADOSE WELLS (P1 , P3- <br /> SWARM AND EX) . <br /> P1 <br /> P1 was placed back on line on November 6, 1991 , after being off <br /> line since September 25 , 1991 . November 12 , 1991 analysis of P1 <br /> displayed a relatively flat line chromatogram, the minute peaks <br /> found on the chromatogram are most likely attributed to residual <br /> compounds from the earlier analysis of the calibrant, P1 was then <br /> taken off line and used to show vacuum influence from the other <br />• vadose zone wells, P3-swarm and EX. The vapor recovery system was <br /> turned off on November 21, 1991 but restarted briefly on December <br /> 16 , 1991 , to test the vadose wells after a period of "re- <br /> equilibration" had occurred. P1 was hooked into the vacuum system <br /> at this time and a sample obtained from the orifice for that well <br /> was analyzed using the 10 s 50 PID chromatograph. After <br /> completion of sampling the wells, the vapor recovery system was <br /> shut off. The resulting chromatogram showed only instrument <br /> noise. Another site visit occurred on January 27 , 1992 . P1 , P3- <br /> Swarm and EX were connected to the vacuum recovery system and the <br /> system restarted. A sample of the effluent from the pumps was <br /> then obtained and then the vacuum recovery system was dismantled. <br /> The resulting chromatogram was a flat line, indicating the absence <br /> of gasoline petroleum hydrocarbons in the areas of the vadose <br /> wells. The P1 well has never showed much vapor recovery and the <br /> area around the well is know void of petroleum hydrocarbon vapors <br /> indicating the Lack of petroleum hydrocarbons in the soil . <br /> P3-Swarm <br /> P3-Swarm wells P3. P3A and P3D have been continuously pulled from <br /> since their installation. The chromatogram produced from the <br /> analysis on November 21 , 1991, shows a relatively flat line, with <br /> minor response probably being attributed to residual peaks from <br /> the previous analysis . The vapor recovery system was then shut <br /> off and two periods of "re-equilibration" occurred. The first <br />. period ended on December 16 , 1991 , when the vapor recovery system <br /> was briefly re-started during the site visit to sample the ground <br /> water monitoring wells. The resulting chromatogram was a flat <br /> page 7 <br />