Laserfiche WebLink
. TABLE 3B <br /> VAPOR RECOVERY SUMMARY <br /> FORMER REGAL STATION 604 <br /> (AUTORITY TO CONSTRUCT) <br /> HOURS OPERATED 336 336 5 337 <br /> TIME 12 5 13 13 5 <br /> TFH STANDARD AREA 0 056 0 056 0 056 <br /> BENZENE STANDARD AREA 0 O 0 <br /> HATE 04/14/92 04/14/92 04/14/92 <br /> TOTAL INFLUENT <br /> TFH MG/L 0 48 0 48 0 48 <br /> BENZENE MG/L 0 00 0 00 0 00 <br /> DIFFERENCE ACROSS ORIFICE 100 00 154 00 154 00 <br /> IN MILLIMETERS (MM) WATER 0 00 0 00 0 00 <br /> FLOW RATE CFM 25 99 32 25 32 25 <br /> TFH POUND PER DAY 1 17 1 45 1 45 <br /> BENZENE LBS/DAY 0 00 0 00 0 00 <br /> TOTAL LBS TFH RECOVERED 13143 47 13143 50 13143 53 <br /> TOTAL GALLONS REMOVED 2102 95 2102 96 2102 96 <br /> TOTAL LBS BEN RECOVERED 290 75 290 75 290 75 <br /> EFFLUENT CARBON 1 <br /> TFH MG/L 0 64 0 64 0 64 <br /> BENZENE MG/L 0 00 0 00 0 00 <br /> FLOW RATE CFM 25 99 32 25 32 25 <br /> TFH POUND PER DAY 1 56 1 94 1 94 <br /> BENZENE LBS/DAY 0 00 0 00 0 00 <br /> EFFLUENT LAST CARBON <br /> TFH MG/L 0 11 0 35 0 13 <br /> BENZENE MG/L 0 000 0 000 0 000 <br /> FLOW RATE CFM 25 99 32 25 32 25 <br /> TFH POUND PER DAY 0 26 1 07 0 39 <br /> BENZENE LBS/DAY 0 00 0 00 0 00 <br /> MW1 <br /> TFH MG/L 0 00 0 00 0 00 <br /> BENZENE MG/L 0 00 0 00 0 00 <br /> DIF ACROSS ORIF, MM W 0 00 0 00 0 00 <br /> FLOW RATE CFM 0 00 0 00 0 00 <br /> TFH POUND PER DAY 0 00 0 00 0 00 <br /> BENZENE LBS/DAY 0 00 0 00 0 00 <br /> LBS TFH RECOVERED 2464 25 2464 25 2464 25 <br /> LBS BEN RECOVERED 78 56 78 56 78 56 <br /> MW5 <br /> TFH MG/L 0 07 0 93 0 93 <br /> BENZENE MG/L 0 00 0 00 0 00 <br /> DIF ACROSS ORIF, MM W 32 00 32 00 32 00 <br /> FLOW RATE CFM 14 70 14 70 14 70 <br /> TFH POUND PER DAY 0 09 1 28 1 28 <br /> BENZENE LBS/DAY 0 00 0 00 0 00 <br /> LBS TFH RECOVERED 8418 36 8418 37 8418 40 <br /> Page 23 <br />