Laserfiche WebLink
The initial pilot test and the subsequent vapor extraction under <br /> xnter3-m variances removed 13 ,116 pounds of hydrocarbons from the <br /> E soil and ground water beneath the site. Vapor recovery is <br /> � i occurring from three areas of past documented soil contamination , <br /> the tank field excavation (EX ) , the eastern product dispenser <br /> island (P1 ) and the western product dispenser island (P3-Swarm) . <br /> ' Also various ground water monitoring wells are utilized , <br /> specifically MW1 and MW5 with occasional use of MW3 , see Table 1 . <br /> VAPOR RECOVERY RESULTS <br /> N The vadose zone vapor recovery wells (P1 , P3-Soarm and EX ) <br /> f contributed little to the total recovered hydrocarbons during the <br /> operation of the vapor recovery system under the variances , P1 = <br /> 1 . 3 pounds , P3-Swarm = 561 . 4 pounds and EX = 127 pounds , see Table <br /> 2. <br /> The ground water monitora-ng wells have produced the ma3ority of <br /> the hydrocarbons recovered at this site during the operation of <br /> the system prior to the authority to construct: MW1 - 2464 . 25 <br /> pounds , MW3 = 11 . 53 pounds , and MW5 = 8394 . 91 pounds <br /> As of July 29 , 1992 , the total system has recovered a calculated <br /> total of 13970 . 09 pounds of hydrocarbons , 854 . 09 of which have <br /> been produced since the beginning of operations under the <br /> Authority to Construct. <br /> As of July 21 , 1992 , the date it was destroyed, P1 had produced <br /> 2 .96 pounds of hydrocarbons or an additional 1 . 63 pounds since the <br /> beginning of operation under the Authority to Construct. see Table <br /> 1 . <br /> VSB5 was added to Vapor extraction well P3-Swarm on 7/27/92 . The <br /> swarm in combination with VSB5 has produced 596 . 24 pounds of <br /> hydrocarbons , an additional 34 . 84 pounds since operation under the <br /> F Authority to Construct , these wells are currently producing <0 .04 <br /> pounds per day , see Table 1 . <br /> Vapor extraction well EX has produced 131 . 31 pounds of <br /> a hydrocarbons , an additional 4 . 18 pounds since operation under the <br /> Authority to Construct , this well was shut down on 7/24/92 see <br /> Table 1 . <br /> As of July 24 , 1992 , MW1 had produced a total of 2534 pounds , of <br /> which 69 . 75 pounds have been produced during operations under the <br /> Authority to Construct . MW1 was shut down on 7/24/92 . <br /> As of July 24 , 1992 , MW5 has produced a total of 9029 . 22 pounds , <br /> of which 634 . 31 pounds have been produced during operations under <br /> the Authority to Construct . MW5 was transferred to use as a clean <br /> air infection well on <br /> 7/24/92 . <br /> R604 vapor , 7/31/92 , p 8 <br />