My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008167
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
3500 - Local Oversight Program
>
PR0544673
>
ARCHIVED REPORTS XR0008167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 3:35:12 AM
Creation date
7/18/2019 3:31:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008167
RECORD_ID
PR0544673
PE
3528
FACILITY_ID
FA0006182
FACILITY_NAME
REGAL STATION #604
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VS135 was added to vapor extraction well P3-Swarm on July 27 1992 . <br /> The swarm �n combination with VSB5 has produced, as ofDecember16-1 <br /> 30, 1993, 900 pounds of hydrocarbons, an additional 341 pounds F <br /> since operation under the Authority to Construct . On August 26, <br /> 1992, the P3-Swarm was disengaged from the vapor extraction <br /> system. <br /> Before being shut down on July 24, 1992, vapor extraction well EX <br /> produced 1.31 . 31 pounds of hydrocarbons, 4 . 18 pounds of which were <br /> produced under the Authority to Construct, see Table 1 . <br /> As of August 26, 1992, MW1 had produced a total of 2534 pounds, <br /> of which 69 . 75 pounds have been produced during operations under <br /> the Authority to Construct . MW1 was shut down on July 24, 1992 . <br /> As of December 30, 1993 , MW5 has produced a total of 1.0568 <br /> pounds, of which 2145 pounds have been produced during operations <br /> under the Authority to Construct . <br /> On July 27, 1992, VSB3 , VSB9 and VSB11 were added to the system. <br /> As of December 30, 1993, these wells had produced the following <br /> amounts of gasoline : VS33 , 59 pounds; VSB9, 1057 pounds; and <br /> VSB11, 536 pounds <br /> Monitor well, MW 3 has not been used for vapor extraction during <br /> the operations under the Authority to Construct . <br /> When the system was turned off on December 30, 1993 , the site was <br /> producing 3 .48 pounds per day of TFH hydrocarbon. <br /> If you have any questions, please call (916) 668-5300 . <br /> Roy utler <br /> Geologist <br /> cc : Ms Mary Meays, San Joaquin County Health <br /> Mr. Gary Reeves, San Joaquin Valley Unified Air Pollution <br /> Control Distric <br /> page 5 of R604 , 01/19/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.