My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008169
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
3500 - Local Oversight Program
>
PR0544673
>
ARCHIVED REPORTS XR0008169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 7:16:23 AM
Creation date
7/18/2019 3:34:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008169
RECORD_ID
PR0544673
PE
3528
FACILITY_ID
FA0006182
FACILITY_NAME
REGAL STATION #604
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VS85 was added to vapor extraction well P3-Swarm on 7/27/92 . The <br /> swarm in combination with VSB5 has produced, as of 11/30/93, 895 <br /> pounds of hydrocarbons, an additional 336 pounds since operation <br /> under the Authority to Construct, VSB5 is currently producing <br /> 0 . 42 pounds per day, see Table 1. On 8/26/92, the P3-Swarm was <br /> disengaged from the vapor extraction system. <br /> Before being shut down on 7/24/92, vapor extraction well EX <br /> produced 131 . 31 pounds of hydrocarbons, 4 . 18 pounds of which were <br /> produced under the Authority to Construct, see Table 1 . <br /> As of August 26, 1992, MW1 had produced a total of 2534 pounds, <br /> of which 69 75 pounds have been produced during operations under <br /> the Authority to Construct . MW1 was shut down on 7/24/92 . <br /> As of November 30, 1993, MW5 has produced a total of 10563 <br /> pounds, of which 2120 pounds have been produced during operations <br /> under the Authority to Construct MW5 was transferred to use as <br /> a clean air in3ection well on 7/24/92 . On 7/27/92, MW5 was <br /> shutdown as an air injection well MW5 was again hooked up as a <br /> vapor extraction well on 8/03/92 <br /> On July 27, 1992, VSB3, VSB9 and VSB11 were added to the system <br /> As of November 30, 1993 , these wells had produced the following <br /> amounts of gasoline : VSB3, 61 pounds; VSB9, 1055 pounds, and <br /> VSB11, 531 pounds. <br /> Monitor well, MW 3 has not been used for vapor extraction during <br /> the operations under the Authority to Construct . <br /> Currently the site is producing 2 66 pounds per day of TFH <br /> hydrocarbon <br /> If you have any questions, please call (916) 668-5300 <br /> RoV <br /> C42�'V <br /> e <br /> Geologist <br /> cc Ms Mary Meays, San Joaquin County Health <br /> Mr Gary Reeves, San Joaquin Valley Unified Air Pollution <br /> Control Distric <br /> r <br /> page 5 of R604 , 12/16/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.