Laserfiche WebLink
1386 EAST BEAMER STREET <br /> A–A–,7Z-3–Qx---jS-7j0FESMRIV WOODLAND, CA 95776-6003 <br /> GEO-ENGINEERS FAX (916) 662-0273 <br /> ' CALIF CONTRACTOR#513857 A CORPORATION (916) 668-5300 <br /> REGISTERED GEOLOGISTS <br /> Ms Mary F Meays, R E H S May 31, 1994 <br /> Environmental Health Division <br /> Public Health Services San Joaquin County <br /> P O Box 2009 <br /> (445 N San Joaquin Street) <br /> Stockton, California 95201 <br /> (2 09) 468-0337 <br /> RE Update Status Report #28 and Closure Request for Former Regal <br /> Service Station #604 , 1448 North E1 Dorado Street, Stockton, <br /> California 95202 , site code . 1081, completion of confirmation <br /> sampling for consideration of Site Closure <br /> Dear Ms . Meays <br /> As stated in your letter to Mr John Margowski of Wickland <br /> Properties, dated December 17, 1993 the following report has been <br /> generated for, and to open discussions with, San Joaquin County <br /> PHS/EHD, Central Valley Regional Water Quality Control Board <br /> (CVRWQCB) , Wickland Properties and Western Geo-Engineers for <br /> considering this site for closure . <br /> Western Geo-Engineers completed the confirmation soil sample <br /> borings on February 2 , 1994 and the Quarterly Ground Water <br /> . Sampling with the Vapor Extraction System (VES) being off for <br /> over 30 days (UPDATE STATUS REPORT #27) At your request the <br /> "Site Closure Summary" , outlined in the CVRWQCB "Addendum to <br /> Appendix All dated October 7, 1993 , is contained in this report, <br /> see Appendix A Let me thank you before hand for your timely <br /> review of this Closure request We are also sending this report <br /> to Ms Elizabeth Thayer of CVRWQCB, as you requested. The <br /> following is a chronology of reports that have been submitted <br /> concerning this site If your file is missing any of these <br /> reports , please let me know <br /> CHRONOLOGY OF REPORTS SUBMITTED FOR FORMER REGAL STATION 604 . <br /> October 9 , 1989 Tank Pull Sampling Report <br /> October 19 , 1989 <br /> revised (November 13 , 1989) Workplan to perform sample <br /> borings and place ground water <br /> monitoring wells <br /> December 27 , 1989 Workplan to over excavate and <br /> install vapor extraction wells <br /> with results of initial sample <br /> borings <br /> • December 15, 1989 Preliminary Assessment Report, <br /> updated January 16 , 1990 Update Status Report #1 <br /> pagel <br />